Data Center Registry
TPC Payson Data Center Campus
Payson, Utah County, Utah
TPC Payson Data Center Campus is a proposed data center in Payson, Utah (Utah County), operated by Twin Palms Capital (TPC Data Centers). The public record puts it at 10 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Twin Palms Capital (TPC Data Centers)
- Facility type
- Data center
- Location
- Payson, Utah County, UT
- Coordinates
- 40.0444, -111.7321 (approximate)
- Power capacity
- Not established from a public source
- Land
- 10 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Rocky Mountain Power
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2026ProposedIn city planning as of mid-2026, with first capacity targeted for about Nov 2027 to Q1 2028 Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 13, 2026. No lawsuit, organized opposition, or contested hearing over TPC Payson Data Center Campus in Payson, Utah County, Utah appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
TPC helped Payson fund a new 40 MW Rocky Mountain Power substation serving local load including this campus. The design includes an option for natural gas or hydrogen firming.
Described as a proprietary low-water system with an on-site water-recycling pond.
Notes on the record
About 150,000 sq ft, two-level building on about 10 acres. No street address is published, and the location is approximate (Payson). The details are developer-provided via a directory listing.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Summit Ridge Data Center · Santaquin · Data Center Power Company6 mi · Under construction · Opposed
- Volition Spanish Fork Data Center · Spanish Fork · Volition Industries7 mi · Proposed · 250 MW · Opposed
- DCPC Data Center Campus (north of Mona) · DCPC13 mi · Permitted
- Newfold Digital Utah County Data Center · Provo · Newfold Digital14 mi · Operating · 3 MW
- Nebo North Data Center Campus (Project Nebo) · Mona · SetSquare Capital Group (Nebo North LLC)16 mi · Permitted · 750 MW · Opposed
- Fibernet Orem Data Center · Orem · Fibernet16 mi · Operating
- Voonami Orem Data Center · Orem · Voonami18 mi · Operating · 2 MW
- Flexential Salt Lake City - Lindon · Lindon · Flexential20 mi · Operating · 0.57 MW
Questions people ask about this site
Is there opposition to the TPC Payson Data Center Campus in Payson?
Nothing on record as of October 13, 2026. No lawsuit, organized opposition, or contested hearing over TPC Payson Data Center Campus in Payson, Utah County, Utah appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the TPC Payson Data Center Campus?
No lawsuit over TPC Payson Data Center Campus appears in the record we track as of October 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does TPC Payson Data Center Campus use?
No water withdrawal figure for TPC Payson Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates TPC Payson Data Center Campus, and how big is it?
Twin Palms Capital (TPC Data Centers) is the operator on record. No capacity figure is on record for this site. The site is recorded at 10 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "TPC Payson Data Center Campus," updated October 13, 2026, https://suedatacenters.org/data-centers/tpc-payson-ut.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/tpc-payson-ut, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Carrier-Neutral Data Center, Payson, UT (TPC) · Baxtel · retrieved October 13, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us