Sue Data Centers

Data Center Registry

Summit Ridge Data Center

Santaquin, Utah County, Utah

Under constructionOpposedRecord updated August 15, 2026

Summit Ridge Data Center is a data center under construction in Santaquin, Utah (Utah County), operated by Data Center Power Company. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
Data Center Power Company
Facility type
Data center
Location
Santaquin, Utah County, UT
Coordinates
39.9755, -111.7852 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Yes. Organized local opposition to Summit Ridge Data Center in Santaquin, Utah County, Utah is documented in the public record, without a lawsuit on file in the sources we track. Contested locally.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

Contested locally. KSL reports over 1,350 petition signatures opposing the facility, residents objecting to its proximity to homes and the Sunroc gravel pit, air-quality fears ('With Santaquin and just Utah in general already having such high pollution, we find that this is not a good placement'), and complaints about a lack of transparency during approval. The city projects 'more than $3 million annually in sales tax revenue'.

Power and water

Off-grid by design. KSL reports it 'will not be connected to the city's electric grid, it will use a series of smaller engines to power itself using natural gas'. Gardner's planned-projects table gives 100 MW nameplate with a 2027 operational year and lists the status as under construction.

KSL reports the developers told the city to expect 'low water and sewer usage', attributed to Mayor Olson. A developer claim relayed by the city, not a measured or permitted figure.

Notes on the record

Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. The one Santaquin CDRA/RDA document directly confirmed, a May 2023 Notice of Intent to Transfer Property, covers a 0.69-acre parcel for the unrelated "West Fields" Community Reinvestment Project Area, not the 20-100MW Ridge Farms Road site. A separately-named 2022 "Summit Ridge Commercial Development" Master Development Agreement is a car-dealership site-plan agreement (per search-engine summaries, not a direct read of the agreement itself), a name collision, not this project's record. The city's full council/RDA meeting-minutes archive was not searched exhaustively, so this is an evidenced absence in the documents checked, not an exhaustive clearance. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Summit Ridge Data Center in Santaquin?

Yes. Organized local opposition to Summit Ridge Data Center in Santaquin, Utah County, Utah is documented in the public record, without a lawsuit on file in the sources we track. Contested locally.

Has anyone filed a lawsuit over the Summit Ridge Data Center?

No lawsuit over Summit Ridge Data Center appears in the record we track as of August 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Summit Ridge Data Center use?

No water withdrawal figure for Summit Ridge Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Summit Ridge Data Center, and how big is it?

Data Center Power Company is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Summit Ridge Data Center," updated August 15, 2026, https://suedatacenters.org/data-centers/summit-ridge-santaquin-ut.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/summit-ridge-santaquin-ut, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Some Santaquin residents raise concerns over approval of future data center · KSL.com · retrieved August 14, 2026
  2. 2.Data Center Growth in Utah and the United States, Data Summary, April 2026 (Planned Data Centers in Utah, March 2026) · Kem C. Gardner Policy Institute, University of Utah · retrieved August 14, 2026
  3. 3.Notice of Intent to Provide Assistance Pursuant to Section 17C-1-207 (West Fields Community Reinvestment Project Area), May 1, 2023 · Santaquin City Community Development and Renewal Agency · retrieved September 5, 2026 · original offline, no archived copy found

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us