Kentucky Enterprise Industrial Park Data Center is a proposed data center in Pikeville, Kentucky (Pike County), operated by MD Squared Power LLC. The public record puts it at a reported $250 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- MD Squared Power LLC
- Facility type
- Data center
- Location
- Pikeville, Pike County, KY
- Coordinates
- 37.4793, -82.5188 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- $250 million
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- 40 permanent; 190 construction
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over Kentucky Enterprise Industrial Park Data Center in Pikeville, Pike County, Kentucky appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
City of Pikeville and Lexington-based MD Squared Power LLC signed a preliminary MOU on 2026-04-20 to explore a data center at the Kentucky Enterprise Industrial Park, with a 120-day exclusive negotiation window; either party could withdraw without penalty. No final development agreement, capacity figure, or exact parcel/address was disclosed as of the source date. Coordinates are a city-level pin (Pikeville, Pike County) since the exact parcel within the industrial park is not confirmed in the source.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Blockware Solutions Pike County Facility · Belfry · Blockware Solutions16 mi · Operating · 75 MW
Questions people ask about this site
Is there opposition to the Kentucky Enterprise Industrial Park Data Center in Pikeville?
Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over Kentucky Enterprise Industrial Park Data Center in Pikeville, Pike County, Kentucky appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Kentucky Enterprise Industrial Park Data Center?
No lawsuit over Kentucky Enterprise Industrial Park Data Center appears in the record we track as of September 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Kentucky Enterprise Industrial Park Data Center use?
No water withdrawal figure for Kentucky Enterprise Industrial Park Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Kentucky Enterprise Industrial Park Data Center, and how big is it?
MD Squared Power LLC is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Kentucky Enterprise Industrial Park Data Center," updated September 13, 2026, https://suedatacenters.org/data-centers/md-squared-power-pikeville-pike-ky.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/md-squared-power-pikeville-pike-ky, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Pikeville signs agreement to explore data center development · WYMT · retrieved September 13, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us