TenKey LandCo Project Lionsgate, Franklin Data Center

Franklin, Simpson County, Kentucky

ProposedIn litigationAI likelyRecord updated July 24, 2026

TenKey LandCo Project Lionsgate, Franklin Data Center is a proposed data center in Franklin, Kentucky (Simpson County), operated by TenKey LandCo I LLC. The public record puts it at announced 2024, 200 acres, a reported $4.8 billion investment. It is or has been the subject of litigation over its siting, permitting, or operation.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
TenKey LandCo I LLC
Facility type
Data center, AI use likely
Location
Franklin, Simpson County, KY
Coordinates
36.7030, -86.5910
Power capacity
Not established from a public source
Land
200 acres
Investment
$4.8 billion
Announced
2024
Utility
Warren Rural Electric Co-op Corp
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
150 permanent
Public subsidy
Not established from a public source
Community reception
In litigation
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. April 2026
    Proposed
    Citizens group files suit to overturn P&Z approval; TenKey's own lawsuit against Simpson County over land use ordinance ongoing Source: WKYU Public Media
  2. March 2026
    Proposed
    Franklin Planning & Zoning Commission approves preliminary development plan 3-2 after two prior defeats Source: Louisville Public Media
  3. 2024
    Proposed
    TenKey LandCo first approaches Franklin; city council and planning commission vote unanimously to reject proposed zoning change; project internally called Project Lionsgate/Blackjack

Opposition and litigation at this site

Yes. TenKey LandCo Project Lionsgate, Franklin Data Center in Franklin, Simpson County, Kentucky is or has been the subject of litigation over its siting, permitting, or operation. Two active lawsuits: (1) TenKey LandCo sues Simpson County in Simpson Circuit Court challenging a December 2025 county ordinance requiring conditional-use permits for data centers, arguing county lacks zoning authority inside Franklin city limits; (2) Franklin Citizens for Responsible Development sues the Franklin P&Z Commission alleging it lacked authority to approve the preliminary plan, which passed 3-2 in March 2026.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.

Two active lawsuits: (1) TenKey LandCo sues Simpson County in Simpson Circuit Court challenging a December 2025 county ordinance requiring conditional-use permits for data centers, arguing county lacks zoning authority inside Franklin city limits; (2) Franklin Citizens for Responsible Development sues the Franklin P&Z Commission alleging it lacked authority to approve the preliminary plan, which passed 3-2 in March 2026. Prior unanimous rejections by Franklin city council and planning commission. End user never publicly disclosed; developer refused to reveal it without NDAs.

Source: WKYU Public Media

Notes on the record

Site: 421 Steele Road (Steele Road near Exit 2 on I-65), Franklin, Simpson County, KY. Coordinates are approximate for that I-65 exit area within Franklin city limits. Three 200,000 sq ft buildings plus on-site natural gas power generation planned. End hyperscaler not publicly identified; Simpson County Judge-Executive Mason Barnes refused to sign NDA and called the pitch full of red flags. Data center opposition became a factor in May 2026 local primary elections in Simpson County. Fix: investmentUsd corrected from $1.6B to $4.8B, LPM confirms total project is 'nearly $5 billion'; the $1.6B figure in the original record is the per-building cost (each of three 200,000 sq ft facilities costs approximately $1.6B, totaling ~$4.8B).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the TenKey LandCo Project Lionsgate, Franklin Data Center in Franklin?

Yes. TenKey LandCo Project Lionsgate, Franklin Data Center in Franklin, Simpson County, Kentucky is or has been the subject of litigation over its siting, permitting, or operation. Two active lawsuits: (1) TenKey LandCo sues Simpson County in Simpson Circuit Court challenging a December 2025 county ordinance requiring conditional-use permits for data centers, arguing county lacks zoning authority inside Franklin city limits; (2) Franklin Citizens for Responsible Development sues the Franklin P&Z Commission alleging it lacked authority to approve the preliminary plan, which passed 3-2 in March 2026.

Has anyone filed a lawsuit over the TenKey LandCo Project Lionsgate, Franklin Data Center?

Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.

How much water does TenKey LandCo Project Lionsgate, Franklin Data Center use?

No water withdrawal figure for TenKey LandCo Project Lionsgate, Franklin Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates TenKey LandCo Project Lionsgate, Franklin Data Center, and how big is it?

TenKey LandCo I LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 200 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "TenKey LandCo Project Lionsgate, Franklin Data Center," updated July 24, 2026, https://suedatacenters.org/data-centers/tenkey-franklin-ky.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/tenkey-franklin-ky, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Second lawsuit filed over proposed data center in Simpson County · WKYU Public Media · retrieved July 6, 2026
  2. 2.Data center developer sues Simpson County government over land use ordinance · Louisville Public Media · retrieved July 6, 2026
  3. 3.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us