Sue Data Centers

Data Center Registry

CENTRA RNO2 (Keystone Data Center)

Reno, Washoe County, Nevada · All 4 CENTRA Digital Interconnect sites

Under constructionContestedRecord updated November 5, 2026

CENTRA RNO2 (Keystone Data Center) is a data center under construction in Reno, Nevada (Washoe County), operated by CENTRA Digital Interconnect. The public record puts it at announced 2024. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
CENTRA Digital Interconnect
Facility type
Data center
Location
265 Keystone Avenue, Reno, Washoe County, NV, 89503
Coordinates
39.5255, -119.8261 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
2024
Utility
Not established from a public source
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Contested
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 2026
    Under construction
    Building permit issued after the 2025-09-11 geotechnical approval; more than 30 soils/compaction inspections during footing work, extended-hours concrete pours approved for May and June 2026, and the final setback/soil/compaction letter approved in June 2026. Source: City of Reno
  2. January 15, 2025
    Permitted
    Conditional use permit approved by the Reno Planning Commission; no appeals were filed. Source: City of Reno

Opposition and litigation at this site

Yes. CENTRA RNO2 (Keystone Data Center) in Reno, Washoe County, Nevada is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. The City of Reno published a standing FAQ for this project specifically because of 'increased public inquiries', covering noise, construction hours, notification, generator emissions and power-demand growth.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.

The City of Reno published a standing FAQ for this project specifically because of 'increased public inquiries', covering noise, construction hours, notification, generator emissions and power-demand growth. Conditions of approval require a 15-ft acoustically absorptive barrier around all rooftop chillers to hold equipment noise to ~43 dBA at the property line against a 53 dBA nighttime ambient.

Source: City of Reno

Power and water

City of Reno's project FAQ describes rooftop chillers and a glycol-based cooling circuit (propylene glycol, with ethylene glycol in some designs), i.e. a recirculating circuit rejecting heat to air rather than an evaporative tower. TMRPA puts the site at roughly 0.29 acre-feet per MW; Nevada LCB puts expected use at approximately 651,000 gallons a year. A cooling-system change was reviewed at building-permit stage with TMWA confirming no significant increase in water demand.

People and entities in the record

  • Alex Velto · public_official via Reno City Planning Commission

    Member of the Reno Planning Commission; voted for conditional use permit LDC25-00026 for the Keystone Data Center. Outcome: approved 4-2 (2025-01-15).

    Source
  • Christina Del Villar · public_official via Reno City Planning Commission

    Member of the Reno Planning Commission; voted against conditional use permit LDC25-00026 for the Keystone Data Center. Outcome: approved 4-2 (2025-01-15).

    Source
  • J.D. Drakulich · public_official via Reno City Planning Commission

    Member of the Reno Planning Commission; voted for conditional use permit LDC25-00026 for the Keystone Data Center. Outcome: approved 4-2 (2025-01-15).

    Source
  • Kerry Rohrmeier · public_official via Reno City Planning Commission

    Chair of the Reno Planning Commission; voted for conditional use permit LDC25-00026 for the Keystone Data Center. Outcome: approved 4-2 (2025-01-15).

    Source
  • Manny Becerra · public_official via Reno City Planning Commission

    Member of the Reno Planning Commission; voted for conditional use permit LDC25-00026 for the Keystone Data Center. Outcome: approved 4-2 (2025-01-15).

    Source
  • Silvia Villanueva · public_official via Reno City Planning Commission

    Member of the Reno Planning Commission; voted against conditional use permit LDC25-00026 for the Keystone Data Center. Outcome: approved 4-2 (2025-01-15).

    Source

Notes on the record

CENTRA's own facility page advertises 4.4 MW available in Q4 2026, liquid-cooling-enabled to 150 kW per cabinet, air-cooled chillers and a target PUE of 1.35 or better. Capacity figures in circulation conflict (3 MW ramping to 6.67 MW as presented to the Planning Commission in January 2025, versus 12 MW advertised later), so no capacity is recorded. Site is split-zoned Industrial/General Commercial and not adjacent to residentially zoned land, which is why Reno's residential property-line noise standard does not apply.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near CENTRA RNO2 (Keystone Data Center)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the CENTRA RNO2 (Keystone Data Center) in Reno?

Yes. CENTRA RNO2 (Keystone Data Center) in Reno, Washoe County, Nevada is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. The City of Reno published a standing FAQ for this project specifically because of 'increased public inquiries', covering noise, construction hours, notification, generator emissions and power-demand growth.

Has anyone filed a lawsuit over the CENTRA RNO2 (Keystone Data Center)?

No lawsuit over CENTRA RNO2 (Keystone Data Center) appears in the record we track as of November 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does CENTRA RNO2 (Keystone Data Center) use?

No water withdrawal figure for CENTRA RNO2 (Keystone Data Center) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates CENTRA RNO2 (Keystone Data Center), and how big is it?

CENTRA Digital Interconnect is the operator on record. We hold 4 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "CENTRA RNO2 (Keystone Data Center)," updated November 5, 2026, https://suedatacenters.org/data-centers/centra-rno2-keystone-reno-nv.

Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/centra-rno2-keystone-reno-nv, retrieved November 5, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Keystone Data Center Frequently Asked Questions (updated 2026-07-28) · City of Reno · retrieved September 24, 2026
  2. 2.CENTRA RNO2, Reno, NV facility page · CENTRA Digital Interconnect · retrieved September 24, 2026
  3. 3.Reno, Nevada data center directory (CENTRA Reno RNO2, 265 Keystone Ave) · goDataCenters · retrieved September 24, 2026
  4. 4.Memo: Data Centers, Background Information (revised 2026-05-12) · Nevada Legislative Counsel Bureau, Research Division · retrieved September 24, 2026
  5. 5.Centra completes structural topping out of Reno data center · Baxtel · retrieved October 14, 2026
  6. 6.Reno City Planning Commission minutes, January 15, 2025 · City of Reno · retrieved November 5, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us