Sue Data Centers

Data Center Registry

Townsite Solar 2 Boulder City Data Center

Boulder City, Clark County, Nevada

ProposedOpposedAI likelyRecord updated September 11, 2026

Townsite Solar 2 Boulder City Data Center is a proposed data center in Boulder City, Nevada (Clark County), operated by Townsite Solar 2 LLC. The public record puts it at announced April 2026, 167 MW planned, 88.5 acres. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Townsite Solar 2 LLC
Facility type
Data center, AI use likely
Location
Boulder City, Clark County, NV
Coordinates
35.9788, -114.8338 (approximate)
Power capacity
167 MW planned
Land
88.5 acres
Investment
Not established from a public source
Announced
April 2026
Utility
Not established from a public source
Power source
Grid
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. July 6, 2026
    Proposed
    Townsite Solar 2 withdrew its application to build on approximately 88.5 acres of Boulder City-owned land; reporting indicates the developer intends to pursue a nearby federally owned parcel instead. Source: City of Boulder City, Nevada

Opposition and litigation at this site

Yes. Organized local opposition to Townsite Solar 2 Boulder City Data Center in Boulder City, Clark County, Nevada is documented in the public record, without a lawsuit on file in the sources we track. Public pushback in Boulder City preceded the applicant's withdrawal of its application for the city-owned parcel on July 6, 2026.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

Public pushback in Boulder City preceded the applicant's withdrawal of its application for the city-owned parcel on July 6, 2026.

Source: City of Boulder City, Nevada

Power and water

Self-supplied through a dedicated project-funded 230 kV line from the Mead substation, completely separate from Boulder City's power distribution system, with on-site battery storage for peak management. Peak demand stated as 167 MW, under 2% of Mead substation capacity.

Air-cooled closed-loop design. Potable water limited to restrooms and an employee kitchen, with roughly 90% of water used returning to the city wastewater treatment system.

Notes on the record

Proposed as two warehouse-style server buildings plus a 230 kV substation, battery energy storage and perimeter fencing, maximum 40-foot height with dark-sky-compliant lighting. The city page states 200-300 construction/testing jobs and 25-40 permanent technical positions; these ranges are not recorded as point values in the jobs field. Reported as a joint venture of Skylar Capital, Arevon Energy and Overwatch Capital, but that ownership was read only in a search summary and is not asserted here. Status is kept at proposed rather than cancelled: the withdrawal was of the city-land application, not of the project.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Townsite Solar 2 Boulder City Data Center in Boulder City?

Yes. Organized local opposition to Townsite Solar 2 Boulder City Data Center in Boulder City, Clark County, Nevada is documented in the public record, without a lawsuit on file in the sources we track. Public pushback in Boulder City preceded the applicant's withdrawal of its application for the city-owned parcel on July 6, 2026.

Has anyone filed a lawsuit over the Townsite Solar 2 Boulder City Data Center?

No lawsuit over Townsite Solar 2 Boulder City Data Center appears in the record we track as of September 11, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Townsite Solar 2 Boulder City Data Center use?

No water withdrawal figure for Townsite Solar 2 Boulder City Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Townsite Solar 2 Boulder City Data Center, and how big is it?

Townsite Solar 2 LLC is the operator on record. Capacity on record is 167 MW. The site is recorded at 88.5 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Townsite Solar 2 Boulder City Data Center," updated September 11, 2026, https://suedatacenters.org/data-centers/townsite-solar-2-boulder-city-nv.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/townsite-solar-2-boulder-city-nv, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page · City of Boulder City, Nevada · retrieved August 29, 2026
  2. 2.Data centers in Nevada - project list (Townsite Solar 2 Boulder City Data Center, Clark County, 170 MW, planned) · Cleanview · retrieved August 29, 2026
  3. 3.IBLA 2026-0213 / IBLA 2026-0216 stay order (Sept. 1, 2026) - City of Boulder City and Center for Biological Diversity v. BLM, Townsite Data Center amended right-of-way · U.S. Department of the Interior, Interior Board of Land Appeals · retrieved September 11, 2026
  4. 4.Nevada city dubs itself a test case for data centers on federal lands near communities - 81-acre BLM parcel in Eldorado Valley, BLM approval released June 26 · KJZZ · retrieved September 11, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us