State Guide
Data Centers in Nevada: Lawsuits, Disputes, and Your Rights
Nevada is a major data center state: Switch's Citadel campus, Google, and Apple anchor the Reno and Tahoe Reno Industrial Center corridor, with more capacity in Las Vegas. No litigation is documented, and this page says so honestly. What Nevada residents should watch in a desert market, and how to tell us about your situation.
Nevada at a glance
Major market
- Market size
- Major; one of the West's largest data center concentrations outside California
- Hot spots
- Reno and the Tahoe Reno Industrial Center (TRIC); Las Vegas
- Key operators
- Switch (Citadel campus), Google, Apple
- Documented disputes
- None documented as of August 2026
- Statewide action
- None documented as of August 2026
Key Takeaways
- Nevada hosts one of the West's major data center concentrations: Switch's Citadel campus, Google, and Apple operate in the Reno and Tahoe Reno Industrial Center corridor, with additional capacity in Las Vegas.
- No lawsuit, enforcement action, or formal dispute involving a Nevada data center is documented as of August 2026.
- Nevada's industrial-park siting model, especially the enormous TRIC campus east of Reno, has kept facilities away from neighborhoods and is a real part of the clean record.
- Water is the structural question in the driest state in the country, and the water fights documented in Georgia and Arizona preview what scrutiny of desert data centers looks like.
- Nevada residents have the standard toolkit if harm arrives: nuisance and property damage claims, zoning participation and appeals, and public records requests about water and power commitments.
Data centers in Nevada, from the registry
All 54 sites54 sites on the public record: 31 operating, 8 under construction, 6 permitted, 9 proposed. 8 carry documented opposition or litigation. 8.4 GW planned.
By county, alphabetically. Each profile carries capacity, land, utility, water, subsidies, jobs, a timeline, and every source.
Churchill County (1 site)
- CC Communications Fallon Data Center · Fallon · CC CommunicationsOperating
Clark County (27 sites)
- Townsite Solar 2 Boulder City Data Center · Boulder City · Townsite Solar 2 LLCPermitted · 167 MW · Opposed
- Switch LAS 19 · Enterprise · SwitchPermitted · Contested
- Novva Las Vegas Data Center · North Las Vegas · Novva Data CentersOperating · 100 MW
- Jet.AI Moapa Data Center Campus · Moapa · Jet.AI Inc.Proposed · 50 MW
- Flexential Las Vegas - North (LAS04) · North Las Vegas · FlexentialOperating · 9 MW
- Cobalt Cheyenne Data Center · Las Vegas · Cobalt Data CentersOperating · 5.5 MW
- Oppidan Post Road Data Center (Paradise) · Paradise · Oppidan Investment CompanyPermitted · 5 MW
- DataBank LAS1 · Las Vegas · DataBankOperating · 3.35 MW
- Flexential Las Vegas - Downtown · Las Vegas · FlexentialOperating · 1.37 MW
- EdgeConneX Las Vegas (EDCLAS01) · Las Vegas · EdgeConneXOperating · 0.75 MW
- ColoXchange Las Vegas Data Center · North Las Vegas · ColoXchangeOperating
- Fiberhub LAS1 · Las Vegas · Fiberhub (VegasNAP, LLC)Operating
- Google Henderson Data Center · Henderson · GoogleOperating
- isp.net Las Vegas Data Center (DC1) · Las Vegas · isp.netOperating
- Lumen Las Vegas 1 · North Las Vegas · Lumen TechnologiesOperating
- Novva Apex Industrial Park Data Center · North Las Vegas · Novva Data CentersProposed
- Switch Apex Industrial Park Land Position · North Las Vegas · SwitchProposed
- Switch Edge 1 · Las Vegas · SwitchOperating
- Switch Las Vegas 10 · Las Vegas · SwitchOperating
- Switch Las Vegas 11 · Las Vegas · SwitchOperating
- Switch Las Vegas 12 · Las Vegas · SwitchOperating
- Switch Las Vegas 14 · Las Vegas · SwitchOperating
- Switch Las Vegas 15 · Las Vegas · SwitchOperating
- Switch Las Vegas 5 · Las Vegas · SwitchOperating
- Switch Las Vegas 7 · Enterprise · SwitchOperating
- Switch Las Vegas 9 · Las Vegas · SwitchOperating
- TPx Las Vegas Data Center · Las Vegas · TPx CommunicationsOperating
Elko County (1 site)
- BluSky AI Wells Modular Data Center · Wells · BluSky AI Inc.Proposed
Lyon County (4 sites)
- Monarch Data Center · Yerington · Copia PowerPermitted · 1 GW · Opposed
- Microsoft Silver Springs Data Center Campus · Silver Springs · MicrosoftProposed · Contested
- Microsoft Victory Logistics District Campus · Fernley · MicrosoftProposed · Contested
- Tract Silver Springs Data Center Park · Silver Springs · TractProposed · 1.6 GW · Supported
Nye County (2 sites)
- Manse Technology Campus · Pahrump · Manse Technology Campus LLCProposed · Opposed
- Sarcobatus Solar Project (off-grid bitcoin mining) · Scotty's Junction · Tesla Solar LLCPermitted
Storey County (14 sites)
- Fleet Data Centers Storey County Campus (South Valley & Peru Ridge) · McCarran · Fleet Data CentersUnder construction · 400 MW · Contested
- Switch CITADEL Campus · McCarran · SwitchOperating · 650 MW · Supported
- Vantage Data Centers NV1 · McCarran · Vantage Data CentersUnder construction · 224 MW · Supported
- Tract Virginia Highlands Technology Park · Lockwood · TractProposed · 2.5 GW
- Peru Shelf Technology Park · TractUnder construction · 810 MW
- Switch Tahoe Reno 1 (The Citadel Campus) · McCarran · SwitchOperating · 650 MW
- EdgeCore Reno Data Center Campus · McCarran · EdgeCore Digital InfrastructureUnder construction · 216 MW
- PowerHouse Reno Campus · McCarran · PowerHouse Data CentersUnder construction · 65 MW
- Novva Tahoe Reno Data Center · McCarran · Novva Data CentersOperating · 60 MW
- Amazon Data Services Reno Data Center Campus · Sparks · Amazon Web ServicesUnder construction
- Colovore Reno 1 (RN01) · McCarran · ColovoreUnder construction
- Google Data Center · GoogleOperating
- Switch Tahoe Reno 2 (The Citadel Campus) · McCarran · SwitchOperating
- Switch Tahoe Reno 3 (The Citadel Campus) · McCarran · SwitchOperating
Washoe County (5 sites)
- CENTRA RNO2 (Keystone Data Center) · Reno · CENTRA Digital InterconnectUnder construction · Contested
- Connect Reno Data Center (Oppidan North Valleys) · Reno · Connect Data Centers (Oppidan Investment Company)Permitted · 5 MW
- Apple Reno Data Center (Reno Technology Park) · Sparks · AppleOperating
- CENTRA RNO1 (200 South Virginia) · Reno · CENTRA Digital InterconnectOperating
- Roller Network Reno Data Center · Reno · Roller Network LLCOperating
In this article
Nevada built its data center industry on purpose: aggressive incentives, huge tracts of industrial land, and the Tahoe Reno Industrial Center, one of the largest industrial parks in the world, drew Switch's Citadel campus, Google, and Apple to the Reno corridor, with more capacity serving Las Vegas. It has also, so far, produced none of the conflict that defines the industry elsewhere: no lawsuit, enforcement action, or formal dispute involving a Nevada data center is documented as of August 2026. The reasons are worth understanding, because they double as a checklist of what could change, and in the driest state in the country, the water question is never far away. Here is the honest picture and the toolkit.
The data center footprint in Nevada
Northern Nevada is the anchor. The Tahoe Reno Industrial Center (TRIC), a vast industrial park east of Reno in Storey County, hosts Switch's Citadel campus, built to be among the largest data center campuses in the world, alongside Google's facility and a roster of other industrial tenants. Apple operates its own campus in the Reno area. Southern Nevada adds Las Vegas capacity, including Switch's home operations.
Nevada's model is distinctive: rather than scattering campuses near communities, the state concentrated them in purpose-built industrial zones, with TRIC the extreme case, an industrial park bigger than some counties, with almost no residential neighbors. Add cheap land, tax incentives, and a dry climate friendly to certain cooling designs, and Nevada became a natural landing zone for the industry's western expansion.
What residents are dealing with
As of August 2026 there is no documented complaint campaign, enforcement action, or lawsuit involving a Nevada data center. The structural questions in a desert state still deserve attention:
- Water in the driest state. Nevada receives less precipitation than any other state, and every large water commitment trades off against municipal growth, agriculture, and tribal and environmental needs. Data center cooling designs vary widely in water intensity, and reporting from Georgia and Arizona shows what happens when big draws meet strained supplies. The right time to scrutinize a facility's water arrangement is before approval.
- Growth beyond the parks. The AI era's appetite is pushing developers toward new sites across the West. Projects proposed outside the industrial-park model, closer to homes or on previously rural land, would carry the conflict profile Nevada has so far avoided.
- Power buildout. Giant loads reshape utility planning, and the who-pays question that Ohio, Virginia, and Oregon answered with dedicated rate classes is live in every growing market.
Lawsuits and disputes in Nevada
None documented. Our research found no lawsuit, regulatory enforcement action, or formal legal dispute involving a data center in Nevada as of August 2026. The Reno corridor and Las Vegas facilities have operated and expanded without documented neighbor litigation.
Why the record is clean, and what would change it. Nevada's quiet is structural: TRIC's isolation means the around-the-clock cooling noise that spawned suits in Wisconsin and Texas has no neighbors to reach, and industrial zoning means no contested rezoning of the kind voided in Virginia and challenged in Georgia. The record would change if projects leave the parks, and the national pattern says the first fight would come at the approval stage: notice, process, and water commitments.
The desert precedent to know. Arizona, Nevada's closest analog, shows both paths. Chandler's noise saga ended with the nation's first data center noise ordinance rather than a lawsuit, while Tucson's Project Blue produced an open meetings law suit over secret land negotiations. Transparency around land and water deals is exactly where desert-state disputes have started.
Your legal options in Nevada
If a facility begins causing harm, or a proposal raises concerns, Nevada residents have the standard toolkit:
- Private nuisance and property damage claims. Constant noise, vibration, dust, or water impacts can support claims for damages and mitigation, typically handled on a contingency fee basis.
- Zoning participation and appeals. County and municipal approvals require notice and process, and defective approvals can be challenged on short deadlines. Storey, Washoe, and Clark county proceedings are all public.
- Public records requests. Water agreements, land deals, and incentive packages are public records, and Oregon's fight in The Dalles established that even site-level water use figures are obtainable.
- Ratepayer participation. Public Utilities Commission of Nevada proceedings on large-load service and rate design are open, and consumer participation has shaped data center tariffs in other states.
A statute of limitations applies to damage claims, commonly two to six years depending on claim type; a Nevada attorney can confirm the deadlines that would govern your situation.
If you live near a Nevada data center
For most Nevadans, the nearest campus sits inside an industrial park and causes no observable impact, and no action is needed. If a new project is proposed near your community, engage early: attend the first hearing, request the water and power details in writing, and establish baselines at home, a well test if you are on one, notes on current noise, photos of existing conditions. Our guide to fighting a proposed data center covers the playbook.
If a facility is already affecting your home, get a legal read on it. Our free intake form lets you tell us what is happening; where a participating attorney who handles these matters in Nevada is available, we may share your information with them with your consent, but we cannot promise that anyone will contact you.
No Nevada case yet. Here is what is happening nearby.
We have not documented a filed case in Nevada. That does not mean a claim is not available to you. These cases come from states next door, where the same operators build and the same harms come up, and the two landmark outcomes below them are the results every neighbor should know about.
- SettledOregonAmazon's $20.5 Million Nitrate Settlement
Settled: $20.5 million, motion for preliminary approval filed March 31, 2026
- SettledOregonThe Dalles v. The Oregonian
Settled December 14, 2022, Wasco County Circuit Court
- Active litigationCaliforniaThe Imperial Valley Water Lawsuit
Pending, Imperial County Superior Court (filed June 2026); developer is the plaintiff
- DismissedArizonaProject Blue in Pima County
Dismissed April 2026, appeal expected
- SettledMichigan· Landmark caseSaline Township v. the $7 Billion Data Center
Settled; project proceeding with community benefits package
- Plaintiff winOhio· Landmark caseAshville, Ohio Put a Data Center Deal on the Ballot. The Ohio Supreme Court Made It Possible by Reading One Paragraph.
Peremptory writ granted for relators, Ohio Supreme Court, August 7, 2026; referendum reported set for the November 3, 2026 ballot
Your rights do not depend on whether someone in Nevada has sued yet. Start with whether you can sue a data center, then what to document now, because the evidence you gather today is what a lawyer will ask for whenever you act.
Frequently asked questions
Can I sue a data center in Nevada?
Nevada law allows nuisance, negligence, and property damage claims if a data center's construction or operations harm your home, and flawed land use approvals can be appealed. As of August 2026 no such suit has been filed in Nevada, largely because the state's facilities sit in isolated industrial parks. The same legal theories homeowners are litigating in other states are available here if harm occurs.
What data centers are in Nevada?
The Reno corridor is the anchor: Switch's Citadel campus and Google operate at the Tahoe Reno Industrial Center east of Reno, and Apple has a campus in the Reno area. Las Vegas hosts additional capacity including Switch's southern operations. Together they make Nevada one of the West's major markets.
How much water do Nevada data centers use?
Site-specific figures depend on cooling design and are best obtained through public records requests for water agreements and utility data. Water scrutiny matters more in Nevada than almost anywhere, as the driest state in the country, and the precedent set in The Dalles, Oregon means operators' site-level water figures are obtainable rather than trade secrets.
Do Nevada data centers cause noise problems?
No noise complaint campaign or lawsuit involving a Nevada data center is documented as of August 2026. The industrial-park siting model keeps most facilities far from homes. If a facility near you does produce constant noise, document it with dated logs and decibel readings and file written complaints, the record that has won mitigation in other states.
Can Nevada residents stop a proposed data center?
The approval process is the leverage point: county land use proceedings are public, approvals require proper notice and process, and defective approvals can be challenged in court on short deadlines. Desert-state fights in Arizona show that transparency around land and water deals is where disputes start, so request those details early and get counsel involved quickly if an approval looks flawed.
Is a data center disrupting your home in Nevada?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us