Novva Las Vegas Data Center
North Las Vegas, Clark County, Nevada · All 6 Novva Data Centers sites
Novva Las Vegas Data Center is an operating data center in North Las Vegas, Nevada (Clark County), operated by Novva Data Centers. The public record puts it at announced September 13, 2022, 100 MW operating, 20 acres, a reported $400 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Novva Data Centers
- Facility type
- Data center
- Location
- 6115 Nicco Way, North Las Vegas, Clark County, NV, 89115
- Coordinates
- 36.2663, -115.0479 (approximate)
- Power capacity
- 100 MW operating
- Land
- 20 acres
- Investment
- $400 million
- Announced
- September 13, 2022
- Utility
- NV Energy
- Power source
- Grid
- Cooling
- air
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 11, 2026OperatingNovva's facility page presents the site as an operating colocation facility with 24x7 on-site staffing. Source: Novva Data Centers
Opposition and litigation at this site
Nothing on record as of September 11, 2026. No lawsuit, organized opposition, or contested hearing over Novva Las Vegas Data Center in North Las Vegas, Clark County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Renewable energy supply in partnership with NV Energy; wholly owned on-premise 100 MW substation.
Novva describes 'waterless cooling, ambient air cooling' with 5,310 tons of air-cooled capacity and perimeter fan walls (N+1). The 2022 announcement said the water-free design was expected to save approximately 150 to 200 million gallons of water a year.
Notes on the record
Building area is stated as 275,000 sq ft in the 2022 announcement and 246,328 sq ft on Novva's current facility page; both figures are left uncollapsed here. Distinct from the operator's separate ~205-acre Apex Industrial Park land position. Coordinates are a street-level OpenStreetMap geocode of Nicco Way.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Flexential Las Vegas - North (LAS04) · North Las Vegas · Flexential3 mi · Operating · 9 MW
- Novva Apex Industrial Park Data Center · North Las Vegas · Novva Data Centers8 mi · Proposed
- Switch Apex Industrial Park Land Position · North Las Vegas · Switch8 mi · Proposed
- Flexential Las Vegas - Downtown · Las Vegas · Flexential9 mi · Operating
- Switch Las Vegas 5 · Las Vegas · Switch9 mi · Operating
- Cobalt Cheyenne Data Center · Las Vegas · Cobalt Data Centers12 mi · Operating · 5.5 MW
- Google Henderson Data Center · Henderson · Google15 mi · Operating
- EdgeConneX Las Vegas (EDCLAS01) · Las Vegas · EdgeConneX15 mi · Operating · 0.75 MW
Questions people ask about this site
Is there opposition to the Novva Las Vegas Data Center in North Las Vegas?
Nothing on record as of September 11, 2026. No lawsuit, organized opposition, or contested hearing over Novva Las Vegas Data Center in North Las Vegas, Clark County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Novva Las Vegas Data Center?
No lawsuit over Novva Las Vegas Data Center appears in the record we track as of September 11, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Novva Las Vegas Data Center use?
No water withdrawal figure for Novva Las Vegas Data Center is on record here. Cooling is recorded as air, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Novva Las Vegas Data Center, and how big is it?
Novva Data Centers is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 100 MW. The site is recorded at 20 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Novva Las Vegas Data Center," updated September 11, 2026, https://suedatacenters.org/data-centers/novva-las-vegas-nicco-way-nv.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/novva-las-vegas-nicco-way-nv, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Novva Data Centers - Las Vegas facility specifications · Novva Data Centers · retrieved September 11, 2026
- 2.Novva Data Centers Announces New Data Center in North Las Vegas featuring Water-Free Cooling and Renewable Energy · PR Newswire / Novva Data Centers · retrieved September 11, 2026
- 3.dcmap.us Las Vegas market listing - Novva North Las Vegas, operational, 100 MW · dcmap.us · retrieved September 11, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us