Data Center Registry
Switch Tahoe Reno 2 (The Citadel Campus)
McCarran, Storey County, Nevada · All 18 Switch sites
Switch Tahoe Reno 2 (The Citadel Campus) is an operating data center in McCarran, Nevada (Storey County), operated by Switch.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Switch
- Facility type
- Data center, AI use likely
- Location
- 1 Superloop Circle, McCarran, Storey County, NV, 89434
- Coordinates
- 39.5139, -119.4849
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- NV Energy
- Power source
- Solar
- On site generation
- 127 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over Switch Tahoe Reno 2 (The Citadel Campus) in McCarran, Storey County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Same Citadel Campus arrangement as Tahoe Reno 1/3: powered by the 127MW behind-the-meter Gigawatt Nevada solar+storage plant plus the 179MW Switch Station 1 & 2 solar delivered via NV Energy's special renewable tariff. 100% renewable Nevada fleet since 2016.
Notes on the record
Confirmed operational per PRNewswire groundbreaking release and baxtel roster (Tahoe Reno 2-8).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Switch Tahoe Reno 3 (The Citadel Campus) · McCarran · Switchunder 1 mile · Operating
- Amazon Data Services Reno Data Center Campus · Sparks · Amazon Web Servicesunder 1 mile · Under construction
- Switch Tahoe Reno 1 (The Citadel Campus) · McCarran · Switchunder 1 mile · Operating · 650 MW
- Colovore Reno 1 (RN01) · McCarran · Colovore1 mi · Permitted
- EdgeCore Reno Data Center Campus · McCarran · EdgeCore Digital Infrastructure2 mi · Under construction · 216 MW
- Peru Shelf Technology Park · Tract2 mi · Under construction · 810 MW
- Novva Tahoe Reno Data Center · McCarran · Novva Data Centers3 mi · Operating · 60 MW
- Fleet Data Centers Storey County Campus (South Valley & Peru Ridge) · McCarran · Fleet Data Centers3 mi · Under construction · 400 MW · Contested
Questions people ask about this site
Is there opposition to the Switch Tahoe Reno 2 (The Citadel Campus) in McCarran?
Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over Switch Tahoe Reno 2 (The Citadel Campus) in McCarran, Storey County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Switch Tahoe Reno 2 (The Citadel Campus)?
No lawsuit over Switch Tahoe Reno 2 (The Citadel Campus) appears in the record we track as of July 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Switch Tahoe Reno 2 (The Citadel Campus) use?
No water withdrawal figure for Switch Tahoe Reno 2 (The Citadel Campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Switch Tahoe Reno 2 (The Citadel Campus), and how big is it?
Switch is the operator on record. We hold 18 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Switch Tahoe Reno 2 (The Citadel Campus)," updated July 24, 2026, https://suedatacenters.org/data-centers/switch-tahoe-reno-2-the-citadel-campus-nv.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/switch-tahoe-reno-2-the-citadel-campus-nv, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Baxtel facility profile, Switch Tahoe Reno 2 (The Citadel Campus) · Baxtel · retrieved July 22, 2026
- 2.OpenStreetMap way/1116775095 · OpenStreetMap · retrieved July 22, 2026
- 3.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
- 4.Switch/Capital Dynamics groundbreaking release · retrieved July 24, 2026
- 5.Switch sustainable data center design page · retrieved July 24, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us