Switch Tahoe Reno 1 (The Citadel Campus) is an operating data center in McCarran, Nevada (Storey County), operated by Switch. The public record puts it at 650 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Switch
- Facility type
- Data center, AI use likely
- Location
- 1 Superloop Circle, McCarran, Storey County, NV, 89434
- Coordinates
- 39.5141, -119.4755
- Power capacity
- 130 MW operating; 650 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- NV Energy
- Power source
- Solar
- On site generation
- 130 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 16, 2026. No lawsuit, organized opposition, or contested hearing over Switch Tahoe Reno 1 (The Citadel Campus) in McCarran, Storey County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Tahoe Reno 1, the flagship building of the Citadel Campus, opened citing up to 130MW of renewable power.
Notes on the record
Citadel Campus, 1 Superloop Circle, McCarran NV 89434, Storey County. Press (PRNewswire/DCD) cites e-commerce/semiconductor + AI/HPC clients at the campus.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Amazon Data Services Reno Data Center Campus · Sparks · Amazon Web Servicesunder 1 mile · Under construction
- Switch Tahoe Reno 3 (The Citadel Campus) · McCarran · Switchunder 1 mile · Operating
- Switch Tahoe Reno 2 (The Citadel Campus) · McCarran · Switchunder 1 mile · Operating
- Colovore Reno 1 (RN01) · McCarran · Colovore1 mi · Permitted
- EdgeCore Reno Data Center Campus · McCarran · EdgeCore Digital Infrastructure2 mi · Under construction · 216 MW
- Novva Tahoe Reno Data Center · McCarran · Novva Data Centers2 mi · Operating · 60 MW
- Peru Shelf Technology Park · Tract2 mi · Under construction · 810 MW
- Fleet Data Centers Storey County Campus (South Valley & Peru Ridge) · McCarran · Fleet Data Centers3 mi · Under construction · 400 MW · Contested
Questions people ask about this site
Is there opposition to the Switch Tahoe Reno 1 (The Citadel Campus) in McCarran?
Nothing on record as of August 16, 2026. No lawsuit, organized opposition, or contested hearing over Switch Tahoe Reno 1 (The Citadel Campus) in McCarran, Storey County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Switch Tahoe Reno 1 (The Citadel Campus)?
No lawsuit over Switch Tahoe Reno 1 (The Citadel Campus) appears in the record we track as of August 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Switch Tahoe Reno 1 (The Citadel Campus) use?
No water withdrawal figure for Switch Tahoe Reno 1 (The Citadel Campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Switch Tahoe Reno 1 (The Citadel Campus), and how big is it?
Switch is the operator on record. We hold 18 sites for that company across the registry. Capacity on record is 650 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Switch Tahoe Reno 1 (The Citadel Campus)," updated August 16, 2026, https://suedatacenters.org/data-centers/switch-tahoe-reno-1-the-citadel-campus-nv.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/switch-tahoe-reno-1-the-citadel-campus-nv, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Switch facility directory · Switch · retrieved July 22, 2026
- 2.OpenStreetMap way/1116775094 · OpenStreetMap · retrieved July 22, 2026
- 3.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
- 4.Switch TAHOE RENO Now Open press release (130MW renewable figure for TR1) · retrieved July 24, 2026
- 5.Switch/Capital Dynamics groundbreaking release · retrieved July 24, 2026
- 6.Switch TAHOE RENO Now Open press release (130MW renewable figure for TR1) · retrieved August 16, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us