EdgeCore Reno Data Center Campus

McCarran, Storey County, Nevada · All 4 EdgeCore Digital Infrastructure sites

Under constructionNo reception on recordAI confirmedRecord updated September 11, 2026

EdgeCore Reno Data Center Campus is a data center under construction in McCarran, Nevada (Storey County), operated by EdgeCore Digital Infrastructure. The public record puts it at announced August 2023, 216 MW planned, 56 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
EdgeCore Digital Infrastructure
Facility type
Data center, AI use confirmed
Location
3000 NV-439, McCarran, Storey County, NV, 89434
Coordinates
39.5430, -119.4851 (approximate)
Power capacity
216 MW planned
Land
56 acres
Investment
Not established from a public source
Announced
August 2023
Utility
Not established from a public source
Cooling
Hybrid
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. January 2026
    Under construction
    EdgeCore reported active construction under way on the first of three data centers at the Greater Reno campus. Source: EdgeCore Digital Infrastructure
  2. August 10, 2023
    Proposed
    EdgeCore announced the purchase of 136 acres in the greater Reno market for a campus capable of supporting over 400 MW of critical load. Source: EdgeCore Digital Infrastructure

Opposition and litigation at this site

Nothing on record as of September 11, 2026. No lawsuit, organized opposition, or contested hearing over EdgeCore Reno Data Center Campus in McCarran, Storey County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

EdgeCore states a flexible cooling design supporting both air-cooled and direct-to-chip liquid-cooled servers, with a WUE rating below 0.01 L/kWh.

Notes on the record

Three hyperscale buildings totalling nearly 1 million sq ft at roughly 72 MW each. Sources diverge on framing: the 2023 announcement describes 136 acres in 'north Reno' supporting 400+ MW, while EdgeCore's current location page describes a 56-acre, 216 MW developed phase in the Tahoe-Reno Industrial Center (Storey County). The current page is treated as authoritative for the developed campus; the larger land position is recorded here rather than as capacity.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the EdgeCore Reno Data Center Campus in McCarran?

Nothing on record as of September 11, 2026. No lawsuit, organized opposition, or contested hearing over EdgeCore Reno Data Center Campus in McCarran, Storey County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the EdgeCore Reno Data Center Campus?

No lawsuit over EdgeCore Reno Data Center Campus appears in the record we track as of September 11, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does EdgeCore Reno Data Center Campus use?

No water withdrawal figure for EdgeCore Reno Data Center Campus is on record here. Cooling is recorded as hybrid, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates EdgeCore Reno Data Center Campus, and how big is it?

EdgeCore Digital Infrastructure is the operator on record. We hold 4 sites for that company across the registry. Capacity on record is 216 MW. The site is recorded at 56 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "EdgeCore Reno Data Center Campus," updated September 11, 2026, https://suedatacenters.org/data-centers/edgecore-reno-campus-storey-county-nv.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgecore-reno-campus-storey-county-nv, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.EdgeCore Reno data center campus - 56 acres, 216 MW critical IT load across three buildings in the Tahoe-Reno Industrial Center · EdgeCore Digital Infrastructure · retrieved August 29, 2026
  2. 2.EdgeCore Digital Infrastructure announces development of Reno, Nevada data center campus · EdgeCore Digital Infrastructure · retrieved August 29, 2026
  3. 3.EdgeCore Reno data center - 3000 NV-439, under construction · Baxtel · retrieved August 29, 2026
  4. 4.PeeringDB facility registry (Nevada) - EdgeCore Reno 1, org EdgeCore Digital Infrastructure, 3000 USA Parkway, McCarran 89434 · PeeringDB · retrieved September 11, 2026
  5. 5.NDEP Class II Air Quality Operating Permit AP7374-4772 issued to MECP1 Reno 1, LLC (RNO1), 3000 USA Parkway, McCarran NV 89437 - Storey County, 126 diesel emergency generators plus 2 fire pumps · Nevada Division of Environmental Protection · retrieved September 11, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us