Data Center Registry
Lumen Reno 1
Reno, Washoe County, Nevada · All 46 Lumen Technologies sites
Lumen Reno 1 is an operating data center in Reno, Nevada (Washoe County), operated by Lumen Technologies.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Lumen Technologies
- Facility type
- Data center
- Location
- 220 Gardner Street, Reno, Washoe County, NV, 89503
- Coordinates
- 39.5245, -119.8272 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 1999OperatingBaxtel reports the facility was set up in 1999 by Williams Telecommunications and is fully operational. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Lumen Reno 1 in Reno, Washoe County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
A small (about 5,925 sq ft) carrier facility originally built by Williams Telecommunications in 1999.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CENTRA RNO2 (Keystone Data Center) · Reno · CENTRA Digital Interconnectunder 1 mile · Under construction · Contested
- CENTRA RNO1 (200 South Virginia) · Reno · CENTRA Digital Interconnectunder 1 mile · Operating
- Roller Network Reno Data Center · Reno · Roller Network LLC5 mi · Operating
- Connect Reno Data Center (Oppidan North Valleys) · Reno · Connect Data Centers (Oppidan Investment Company)7 mi · Permitted · 5 MW
- Tract Virginia Highlands Technology Park · Lockwood · Tract10 mi · Proposed · 2.5 GW
- Vantage Data Centers NV1 · McCarran · Vantage Data Centers13 mi · Under construction · 224 MW · Supported
- Apple Reno Data Center (Reno Technology Park) · Sparks · Apple15 mi · Operating
- Google Data Center · Google17 mi · Operating
Questions people ask about this site
Is there opposition to the Lumen Reno 1 data center in Reno?
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Lumen Reno 1 in Reno, Washoe County, Nevada appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Lumen Reno 1 data center?
No lawsuit over Lumen Reno 1 appears in the record we track as of October 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Lumen Reno 1 use?
No water withdrawal figure for Lumen Reno 1 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Lumen Reno 1, and how big is it?
Lumen Technologies is the operator on record. We hold 46 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Lumen Reno 1," updated October 14, 2026, https://suedatacenters.org/data-centers/lumen-reno-1-gardner-street-nv.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/lumen-reno-1-gardner-street-nv, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Baxtel: Lumen Reno 1 (220 Gardner Street) · Baxtel · retrieved October 14, 2026
- 2.OSM Nominatim geocode: 220 Gardner Street, Reno · OpenStreetMap Nominatim · retrieved October 14, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us