Amazon Pecos County Data Center Campus
Pecos County, Texas · All 8 Amazon Data Services sites · Every Amazon case on our tracker
Amazon Pecos County Data Center Campus is a proposed data center in Texas (Pecos County), operated by Amazon Data Services, Inc. The public record puts it at announced August 9, 2026, a reported $900 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Amazon Data Services, Inc.
- Facility type
- Data center
- Location
- 6000 TX-18, Pecos County, TX
- Coordinates
- 30.8981, -102.8779 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- $900 million
- Announced
- August 9, 2026
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Amazon Pecos County Data Center Campus in Pecos County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Three buildings (A, B, C), 189,060 sq ft / $300M each ($900M total this phase), at 6000 TX-18, ~11 miles north of Fort Stockton; construction planned Aug-Dec 2026. To be powered initially off-grid by Pacifico Energy's 'GW Ranch' gas plant (as of August 2026, already tracked as GW Ranch; Construction Review Online reports that Amazon confirmed it acquired the GW Ranch site and plans to draw power directly from the plant, and, as of October 2026, no cited source says how far this campus's address is from the plant) with a path to future grid interconnection; distinct facility/operator from that record and from Microsoft's and Core Scientific's separate campuses at Pecos, in Reeves County. The map point is an approximate Fort Stockton-area point, not the campus site, which reporting places about 11 miles north of the city.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Lancium Fort Stockton Clean Campus · Fort Stockton · Lanciumunder 1 mile · Operating · 325 MW
- Poolside Project Horizon AI Campus · Poolside AIunder 1 mile · Proposed · 2 GW
Questions people ask about this site
Is there opposition to the Amazon Pecos County Data Center Campus in Pecos County, Texas?
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Amazon Pecos County Data Center Campus in Pecos County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Amazon Pecos County Data Center Campus?
No lawsuit over Amazon Pecos County Data Center Campus appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Amazon Pecos County Data Center Campus use?
No water withdrawal figure for Amazon Pecos County Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Amazon Pecos County Data Center Campus, and how big is it?
Amazon Data Services, Inc. is the operator on record. We hold 8 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Amazon Pecos County Data Center Campus," updated October 28, 2026, https://suedatacenters.org/data-centers/amazon-pecos-county-data-center-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/amazon-pecos-county-data-center-tx, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Amazon Files Plans for New Data Center Buildings in Texas · US Data Center Projects · retrieved August 25, 2026
- 2.Amazon's planned data center campus in Pecos County, Texas: Read Amazon's statement · About Amazon · retrieved August 25, 2026
- 3.Amazon Backs 7.65-GW Gas Plant in Texas to Power New AI Data Center Campus · Construction Review Online · retrieved October 28, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us