Equinix LA3
El Segundo, Los Angeles County, California · All 23 Equinix sites
Equinix LA3 is an operating data center in El Segundo, California (Los Angeles County), operated by Equinix.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Equinix
- Facility type
- Data center
- Location
- 1920 East Maple Avenue, El Segundo, Los Angeles County, CA, 90245
- Coordinates
- 33.9263, -118.3941 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 2, 2026. No lawsuit, organized opposition, or contested hearing over Equinix LA3 in El Segundo, Los Angeles County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Multi-tenant colocation/interconnection facility (cloud on-ramps to AWS/GCP, FASTER subsea cable peering); no AI/HPC-specific marketing found. A widely-repeated ~7.8MW capacity claim is unconfirmed by any source and is omitted; aggregator sites converge on ~5.0MW but that figure traces only to an aggregator page, not a direct primary fetch, so it is likewise omitted rather than asserted. Equinix's own product page returned HTTP 403 to direct fetch this pass; existence/address confirmed via Baxtel, PeeringDB, and OSM instead. Distinct building from the adjacent Equinix LA4 (445 North Douglas Street) on the same El Segundo campus. Coordinates are an approximate building-centroid geocode (OSM), not a parcel-confirmed point.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Serverfarm LAX1 · El Segundo · Serverfarmunder 1 mile · Operating · 17.3 MW
- Equinix LA4 · El Segundo · Equinixunder 1 mile · Operating
- Digital Realty LAX12 · El Segundo · Digital Realtyunder 1 mile · Operating
- Prime Data Centers LAX01 · Vernon · Prime Data Centers11 mi · Operating · 33 MW
- Digital Realty Vernon Data Center · Vernon · Digital Realty11 mi · Proposed · 32 MW
- Digital Realty 727 S. Grand Avenue (DTLA) · Los Angeles · Digital Realty11 mi · Proposed
- Vernon LA Campus (with Goodman Group) · Vernon · DataBank11 mi · Proposed · 32 MW
- CoreSite LA1 (One Wilshire) · Los Angeles · CoreSite12 mi · Operating
Questions people ask about this site
Is there opposition to the Equinix LA3 data center in El Segundo?
Nothing on record as of August 2, 2026. No lawsuit, organized opposition, or contested hearing over Equinix LA3 in El Segundo, Los Angeles County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Equinix LA3 data center?
No lawsuit over Equinix LA3 appears in the record we track as of August 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Equinix LA3 use?
No water withdrawal figure for Equinix LA3 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Equinix LA3, and how big is it?
Equinix is the operator on record. We hold 23 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Equinix LA3," updated August 2, 2026, https://suedatacenters.org/data-centers/equinix-la3-el-segundo-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/equinix-la3-el-segundo-ca, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Equinix LA3 official facility page · Equinix · retrieved August 2, 2026
- 2.Equinix El Segundo LA3 - Baxtel facility record · Baxtel · retrieved August 2, 2026
- 3.Equinix LA3/LA4 - Los Angeles, El Segundo (PeeringDB facility record) · PeeringDB · retrieved August 2, 2026
- 4.OpenStreetMap way/424945843 (1920 East Maple Avenue building) · OpenStreetMap · retrieved August 2, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us