Data Center Registry
Digital Realty LAX12
El Segundo, Los Angeles County, California · All 54 Digital Realty sites
Digital Realty LAX12 is an operating data center in El Segundo, California (Los Angeles County), operated by Digital Realty.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Digital Realty
- Facility type
- Data center
- Location
- 2260 East El Segundo Boulevard, El Segundo, Los Angeles County, CA, 90245
- Coordinates
- 33.9157, -118.3846
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Southern California Edison (SCE)
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 8, 2026. No lawsuit, organized opposition, or contested hearing over Digital Realty LAX12 in El Segundo, Los Angeles County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
132,000 sqft building, 18MW total power, Tier 3. Capacity removed 2026-08-08: the record carried 18 MW cited to the Digital Realty LAX12 page, but that page publishes no MW figure, and archived snapshots from 2023-06 and 2025-10 show it never did. The figure was mis-cited; no citable replacement was found.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Serverfarm LAX1 · El Segundo · Serverfarmunder 1 mile · Operating · 17.3 MW
- Equinix LA4 · El Segundo · Equinixunder 1 mile · Operating
- Equinix LA3 · El Segundo · Equinixunder 1 mile · Operating
- Prime Data Centers LAX01 · Vernon · Prime Data Centers11 mi · Operating · 33 MW
- Digital Realty Vernon Data Center · Vernon · Digital Realty11 mi · Proposed · 32 MW
- Vernon LA Campus (with Goodman Group) · Vernon · DataBank11 mi · Proposed · 32 MW
- Digital Realty 727 S. Grand Avenue (DTLA) · Los Angeles · Digital Realty12 mi · Proposed
- CoreSite LA1 (One Wilshire) · Los Angeles · CoreSite12 mi · Operating
Questions people ask about this site
Is there opposition to the Digital Realty LAX12 data center in El Segundo?
Nothing on record as of August 8, 2026. No lawsuit, organized opposition, or contested hearing over Digital Realty LAX12 in El Segundo, Los Angeles County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Digital Realty LAX12 data center?
No lawsuit over Digital Realty LAX12 appears in the record we track as of August 8, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Digital Realty LAX12 use?
No water withdrawal figure for Digital Realty LAX12 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Digital Realty LAX12, and how big is it?
Digital Realty is the operator on record. We hold 54 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Digital Realty LAX12," updated August 8, 2026, https://suedatacenters.org/data-centers/digital-realty-lax12-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/digital-realty-lax12-ca, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Digital Realty official facility page (LAX12, 2260 E El Segundo Blvd) · Digital Realty · retrieved July 22, 2026
- 2.OpenStreetMap way/424945852 · OpenStreetMap · retrieved July 22, 2026
- 3.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us