Goodman Energy Park Data Center
Vernon, Los Angeles County, California · All 2 Goodman Group sites
Goodman Energy Park Data Center is a proposed data center in Vernon, California (Los Angeles County), operated by Goodman Group.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Goodman Group
- Facility type
- Data center
- Location
- 3163 East Vernon Avenue, Vernon, Los Angeles County, CA, 90058
- Coordinates
- 34.0056, -118.2182 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Vernon Public Utilities
- On site generation
- 99 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 14, 2026ProposedSmall Power Plant Exemption application for the Vernon Backup Generating Facility is under review at the California Energy Commission. Source: California Energy Commission
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over Goodman Energy Park Data Center in Vernon, Los Angeles County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
CEC Small Power Plant Exemption 25-SPPE-01 (under review): 40 diesel-fired generators, 38 rated 3 MW and 2 rated 1 MW, providing up to 99 MW of backup generation for use when electricity from Vernon Public Utilities is unavailable.
Notes on the record
Two buildings: Building 1 at 3163 East Vernon Avenue and Building 2 at 3049 East Vernon Avenue; applicant of record is GIC Vernon LLC. ⚠️ REVIEWER FLAG: this shares a Vernon campus with the already-tracked DataBank/Goodman joint venture (databank-vernon-la-ca) at 3094 East Vernon Avenue, 32 MW. Emitted as a separate record because the CEC filing names two different building addresses and a different capacity; merge if a reviewer judges them one facility.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Vernon LA Campus (with Goodman Group) · Vernon · DataBankunder 1 mile · Under construction · 32 MW
- Digital Realty Vernon Data Center · Vernon · Digital Realtyunder 1 mile · Proposed · 32 MW
- Prime Data Centers LAX01 · Vernon · Prime Data Centersunder 1 mile · Operating · 33 MW
- Digital Realty 727 S. Grand Avenue (DTLA) · Los Angeles · Digital Realty4 mi · Proposed
- CoreSite LA1 (One Wilshire) · Los Angeles · CoreSite4 mi · Operating
- CoreSite LA2 - Los Angeles, CA · Los Angeles · CoreSite4 mi · Operating
- DigiCo LAX1 (1977 Saturn Street) · Monterey Park · DigiCo Infrastructure REIT6 mi · Cancelled · Opposed
- Equinix LA4 · El Segundo · Equinix11 mi · Operating
Questions people ask about this site
Is there opposition to the Goodman Energy Park Data Center in Vernon?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over Goodman Energy Park Data Center in Vernon, Los Angeles County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Goodman Energy Park Data Center?
No lawsuit over Goodman Energy Park Data Center appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Goodman Energy Park Data Center use?
No water withdrawal figure for Goodman Energy Park Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Goodman Energy Park Data Center, and how big is it?
Goodman Group is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Goodman Energy Park Data Center," updated September 14, 2026, https://suedatacenters.org/data-centers/goodman-energy-park-vernon-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/goodman-energy-park-vernon-ca, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Vernon Backup Generating Facility (25-SPPE-01) · California Energy Commission · retrieved September 14, 2026
- 2.Nominatim geocode of 3163 East Vernon Avenue, Vernon, CA · OpenStreetMap contributors · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us