GeoBitmine Bingham County Facility is a proposed crypto mining site in Aberdeen, Idaho (Bingham County), operated by GeoBitmine. The public record puts it at announced 2022, 6 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
GeoBitmine
Facility type
Crypto mining
Location
Aberdeen, Bingham County, ID
Coordinates
42.9442, -112.8383 (approximate)
Power capacity
6 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
2022
Utility
Not established from a public source
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over GeoBitmine Bingham County Facility in Aberdeen, Bingham County, Idaho appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

Proposed co-generation crypto-mine + greenhouse project at the closed J.R. Simplot potato-processing plant in Aberdeen (Bingham County). GeoBitmine planned to pipe mining-rig waste heat into industrial greenhouses (with a University of Idaho seed-research tie-in) and estimated a 6 MW load. Project stalled when Idaho Power created a crypto-specific "Schedule 20" tariff (approved June 15, 2022) that GeoBitmine calls discriminatory, it allows up to 225 hours/year of interruptible service and marginal energy-based pricing, which GeoBitmine says makes financing impossible; GeoBitmine filed for PUC reconsideration July 6, 2022. This wave's directly-read sourcing tops out at 2022; secondary (unread) search results suggest the Schedule 20 dispute was still before the Idaho PUC as late as January 2026, but that later date was not independently verified against a primary document this session, treat status as long-pending/unresolved rather than confirmed-dead or confirmed-built.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the GeoBitmine Bingham County Facility in Aberdeen?

Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over GeoBitmine Bingham County Facility in Aberdeen, Bingham County, Idaho appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the GeoBitmine Bingham County Facility?

No lawsuit over GeoBitmine Bingham County Facility appears in the record we track as of August 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does GeoBitmine Bingham County Facility use?

No water withdrawal figure for GeoBitmine Bingham County Facility is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates GeoBitmine Bingham County Facility, and how big is it?

GeoBitmine is the operator on record. Capacity on record is 6 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "GeoBitmine Bingham County Facility," updated August 5, 2026, https://suedatacenters.org/data-centers/geobitmine-aberdeen-id.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/geobitmine-aberdeen-id, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.GeoBitmine challenges Idaho Power's 'discriminatory' rate for cryptocurrency mining facilities · Utility Dive · retrieved August 5, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us