phoenixNAP PHX02
Phoenix, Maricopa County, Arizona
phoenixNAP PHX02 is a data center under construction in Phoenix, Arizona (Maricopa County), operated by phoenixNAP. The public record puts it at 50 MW planned, 6.54 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- phoenixNAP
- Facility type
- Data center
- Location
- 3221 E Elwood St, Phoenix, Maricopa County, AZ, 85034
- Coordinates
- 33.4165, -112.0117 (approximate)
- Power capacity
- 50 MW planned
- Land
- 6.54 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2026Under constructionAZBEX reports the company hopes to have first-floor construction finished by Q4 2026; preliminary plan review was filed May 2024 and a zoning-adjustment time extension was granted 27 March 2025. Source: AZBEX
Opposition and litigation at this site
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over phoenixNAP PHX02 in Phoenix, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
AZBEX reports power for the building is to be supplied by Bloom Energy.
Notes on the record
Second phoenixNAP data center, on a 6.54-acre parcel at 3221 E. Elwood St., across the street from the operator's 2010 facility. AZBEX reports 530,000 sq ft, roughly 15,000 racks at about 44 kW density, and initial capacity of 30 MW with potential to increase to 50 MW. Coordinates are geocoded from the cited street address (Nominatim and US Census geocoder agree to ~10 m); they are not parcel-confirmed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- STACK Infrastructure PHX02 Campus · Phoenix · STACK Infrastructure3 mi · Under construction · 250 MW
- Iron Mountain AZP-2 · Phoenix · Iron Mountain3 mi · Operating
- Iron Mountain AZP-1 · Phoenix · Iron Mountain3 mi · Operating
- Lumen Phoenix 1 · Phoenix · Lumen Technologies6 mi · Operating
- Digital Realty PHX (Tempe) · Tempe · Digital Realty8 mi · Operating · 33.8 MW
- Centersquare PHX3 · Mesa · Centersquare (Cyxtera/Evoque)9 mi · Operating · 17.3 MW
- AWS Laveen Data Center Campus · Laveen · Amazon Web Services9 mi · Proposed
- Digital Realty PHX15 · Chandler · Digital Realty12 mi · Operating
Questions people ask about this site
Is there opposition to the phoenixNAP PHX02 data center in Phoenix?
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over phoenixNAP PHX02 in Phoenix, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the phoenixNAP PHX02 data center?
No lawsuit over phoenixNAP PHX02 appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does phoenixNAP PHX02 use?
No water withdrawal figure for phoenixNAP PHX02 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates phoenixNAP PHX02, and how big is it?
phoenixNAP is the operator on record. Capacity on record is 50 MW. The site is recorded at 6.54 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "phoenixNAP PHX02," updated September 10, 2026, https://suedatacenters.org/data-centers/phoenixnap-phx02-phoenix-az.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/phoenixnap-phx02-phoenix-az, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.New Data Center Planned in South Phoenix · AZBEX · retrieved September 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us