Prime Data Centers Starpointe Campus
Hanover Township, Washington County, Pennsylvania · All 9 Prime Data Centers sites
Prime Data Centers Starpointe Campus is a proposed data center in Hanover Township, Pennsylvania (Washington County), operated by Prime Data Centers LLC. The public record puts it at 155 acres. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Prime Data Centers LLC
- Facility type
- Data center
- Location
- Hanover Township, Washington County, PA
- Coordinates
- 40.4211, -80.4645 (approximate)
- Power capacity
- Not established from a public source
- Land
- 155 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- On site gas
- On site generation
- 350 MW
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 2, 2026ProposedConditional use permit hearings under way. DEP reviewing the air permit for the power plant. Construction targeted for early 2027. Source: Herald-Standard
Opposition and litigation at this site
Yes. Organized local opposition to Prime Data Centers Starpointe Campus in Hanover Township, Washington County, Pennsylvania is documented in the public record, without a lawsuit on file in the sources we track. More than 200 residents packed conditional use hearings; signs read 'no data centers in Hanover Township'.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
More than 200 residents packed conditional use hearings; signs read 'no data centers in Hanover Township'.
Power and water
350 MW natural gas plant with a lateral to the Rover Pipeline, independent of the local grid.
Developer describes closed-loop cooling that recycles water on site.
Notes on the record
About 1.8M sq ft across seven buildings on pre-graded pads in Starpointe Business Park. About 155 acres under contract from ALTIAN Development LLC. 'Several hundred million dollars' investment. The pin is the township centroid.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Shippingport Industrial Park · Shippingport · Aligned Data Centers14 mi · Under construction · 2 GW · Mixed reception
- Big Digital Energy Midland Facility · Midland · Big Digital Energy16 mi · Operating · 120 MW
- Aliquippa Data Center (former J&L Steel site) · Aliquippa · Five 9s Digital17 mi · Proposed · 496 MW
- Project Astralus (Yellow Creek Township) · Zuharis18 mi · Proposed · Mixed reception
- Ardent Data Centers Pittsburgh (McKees Rocks) · McKees Rocks · Ardent Data Centers (Northern Data Group)20 mi · Operating · 20 MW
- AgriFORCE Bitcoin Mining Facility, West Point · West Point · AgriFORCE Growing Systems Ltd.21 mi · Operating · 3 MW
- Stowe Township Data Center (former railcar plant) · Stowe Township · SunCap Industries21 mi · Proposed · Mixed reception
- Expedient PIT1 (Green Tree / Pittsburgh South) · Pittsburgh · Expedient22 mi · Operating · 1.8 MW
Questions people ask about this site
Is there opposition to the Prime Data Centers Starpointe Campus in Hanover Township?
Yes. Organized local opposition to Prime Data Centers Starpointe Campus in Hanover Township, Washington County, Pennsylvania is documented in the public record, without a lawsuit on file in the sources we track. More than 200 residents packed conditional use hearings; signs read 'no data centers in Hanover Township'.
Has anyone filed a lawsuit over the Prime Data Centers Starpointe Campus?
No lawsuit over Prime Data Centers Starpointe Campus appears in the record we track as of October 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Prime Data Centers Starpointe Campus use?
No water withdrawal figure for Prime Data Centers Starpointe Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Prime Data Centers Starpointe Campus, and how big is it?
Prime Data Centers LLC is the operator on record. We hold 9 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 155 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Prime Data Centers Starpointe Campus," updated October 15, 2026, https://suedatacenters.org/data-centers/prime-data-centers-starpointe-hanover-township-washington-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/prime-data-centers-starpointe-hanover-township-washington-pa, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Developer details expansive Starpointe data center proposal · Herald-Standard · retrieved October 15, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.