AiNET CyberNAP is an operating data center in Glen Burnie, Maryland (Anne Arundel County), operated by AiNET. The public record puts it at 80 MW operating, 15 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- AiNET
- Facility type
- Data center
- Location
- 7900 Ritchie Highway, Glen Burnie, Anne Arundel County, MD, 21061
- Coordinates
- 39.1690, -76.6120 (approximate)
- Power capacity
- 80 MW operating
- Land
- 15 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 26, 2026OperatingListed as an operational carrier hotel and colocation facility. Source: Cloud and Colocation
Opposition and litigation at this site
Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over AiNET CyberNAP in Glen Burnie, Anne Arundel County, Maryland appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Operator states over 80 MW of protected power delivered as 2N dual feeds from two independent substations on separate grids.
Notes on the record
Carrier hotel and colocation campus of roughly 300,000-360,000 sq ft on 15 acres, less than 10 miles from Fort Meade, with three concentric security zones and power density above 25 kW per cabinet. Capacity is operator-stated.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- TierPoint Baltimore - BWI · Linthicum Heights · TierPoint5 mi · Operating
- Expedient Baltimore - Tide Point · Baltimore · Expedient7 mi · Operating · 2 MW
- TierPoint Baltimore (Russell Street) · Baltimore · TierPoint7 mi · Operating
- Lumen Baltimore 1 · Baltimore · Lumen Technologies8 mi · Operating
- 1500 Woodlawn Drive Data Center Campus · Woodlawn · Security Land and Development LP13 mi · Proposed · 150 MW · Contested
- 12401 Prosperity Drive Data Center · Silver Spring · Sansone Group / Priseda20 mi · Operating · 35.2 MW
- Expedient BWI1 (Owings Mills) · Owings Mills · Expedient21 mi · Operating · 0.8 MW
- Brightseat Tech Park · Landover · Lerner Enterprises / The Tower Companies (Brightseat Associates LLC)21 mi · Permitted · 820 MW · Opposed
Questions people ask about this site
Is there opposition to the AiNET CyberNAP data center in Glen Burnie?
Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over AiNET CyberNAP in Glen Burnie, Anne Arundel County, Maryland appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the AiNET CyberNAP data center?
No lawsuit over AiNET CyberNAP appears in the record we track as of August 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does AiNET CyberNAP use?
No water withdrawal figure for AiNET CyberNAP is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates AiNET CyberNAP, and how big is it?
AiNET is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 80 MW. The site is recorded at 15 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "AiNET CyberNAP," updated August 26, 2026, https://suedatacenters.org/data-centers/ainet-cybernap-glen-burnie-md.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/ainet-cybernap-glen-burnie-md, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.CyberNAP, AiNET · AiNET · retrieved August 26, 2026
- 2.AiNET, Glen Burnie CyberNAP Data Center · Cloud and Colocation · retrieved August 26, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.