Sue Data Centers

Data Center Registry

Aventus Lakes Data Center

Milwaukee, Milwaukee County, Wisconsin · All 2 Aventus Data Centers sites

OperatingNo reception on recordRecord updated September 13, 2026

Aventus Lakes Data Center is an operating data center in Milwaukee, Wisconsin (Milwaukee County), operated by Aventus Data Centers.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Aventus Data Centers
Facility type
Data center
Location
7901 W. Clinton Ave., Milwaukee, Milwaukee County, WI, 53223
Coordinates
43.1513, -88.0097 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Grid
Cooling
Not established
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over Aventus Lakes Data Center in Milwaukee, Milwaukee County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

4,000 amp underground utility power feed, dual full-load long-haul diesel generators, dual UPS power conditioning and battery backup.

The operator describes three "data vaults", Vault 1 air-cooled secure cabinets (4,900 sq ft), Vault 2 a liquid-cooled supercomputer configuration (2,000 sq ft), Vault 3 air-cooled expansion (4,000 sq ft), plus "Redundant Cooling systems" and plenum-directed cooling. Those describe rack-level heat capture, not the heat-rejection method, so the coolingType axis is genuinely not identified by the source.

Notes on the record

26,432 sq ft carrier-hotel and colocation facility in Milwaukee's Granville area, marketed as engineered for AI/GPU retrofit (415V three-phase, direct liquid cooling) alongside conventional air-cooled cabinets. Not a duplicate of any tracked Milwaukee site: distinct from Data Holdings (3135 W. Highland), TierPoint, and Expedient MKE1 (4777 W. Ironwood, Franklin).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Aventus Lakes Data Center?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Aventus Lakes Data Center in Milwaukee?

Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over Aventus Lakes Data Center in Milwaukee, Milwaukee County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Aventus Lakes Data Center?

No lawsuit over Aventus Lakes Data Center appears in the record we track as of September 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Aventus Lakes Data Center use?

No water withdrawal figure for Aventus Lakes Data Center is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Aventus Lakes Data Center, and how big is it?

Aventus Data Centers is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Aventus Lakes Data Center," updated September 13, 2026, https://suedatacenters.org/data-centers/aventus-lakes-milwaukee-wi.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/aventus-lakes-milwaukee-wi, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Aventus Lakes, operator facility page (address, 26,432 sq ft, vaults, power) · Aventus Data Centers · retrieved September 13, 2026
  2. 2.Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists "Aventus Lakes, Milwaukee") · Milwaukee Journal Sentinel via Yahoo News · retrieved September 13, 2026
  3. 3.OpenStreetMap/Nominatim geocode of 7901 West Clinton Avenue, Granville, Milwaukee (coordinate provenance) · OpenStreetMap contributors · retrieved September 13, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.