Data Center Registry
N15W24250 Riverwood Drive Data Centre (Pewaukee)
Pewaukee, Waukesha County, Wisconsin · All 2 Mapletree Redwood Data Centre Trust sites
N15W24250 Riverwood Drive Data Centre (Pewaukee) is an operating data center in Pewaukee, Wisconsin (Waukesha County), operated by Mapletree Redwood Data Centre Trust.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Mapletree Redwood Data Centre Trust
- Facility type
- Data center
- Location
- N15 W24250 Riverwood Drive, Pewaukee, Waukesha County, WI, 53188
- Coordinates
- 43.0528, -88.2305 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over N15W24250 Riverwood Drive Data Centre (Pewaukee) in Pewaukee, Waukesha County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Two-storey data centre in the Riverwood Corporate Center, 142,952 sq ft total with roughly 40,000 sq ft of gross data centre area, completed 1985 and described as fully operational. Ownership chain: AT&T sold to Carter Validus Mission Critical REIT for $51.8 million in 2013 (with a 10-year AT&T leaseback); Hudson DC Assets LLC acquired it in 2017; Mapletree acquired it in 2020. Baxtel's MW figure is paywalled on the facility page, so no capacity is recorded. Both substantive sources are the same publisher, hence "reported".
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Aventus Lakes Data Center · Milwaukee · Aventus Data Centers13 mi · Operating
- TierPoint Milwaukee · Milwaukee · TierPoint14 mi · Operating
- Data Holdings Milwaukee Data Center · Milwaukee · Data Holdings LLC14 mi · Operating · 10 MW
- Wells Interconnection Data Center (Wells Building) · Milwaukee · Wells Interconnection16 mi · Operating
- CyberLynk Franklin Data Center (MKE1) · Franklin · CyberLynk Network, Inc.18 mi · Operating
- Expedient MKE1 (Milwaukee/Franklin) · Franklin · Expedient18 mi · Operating · 1.6 MW
- ISCorp Mequon Data Center (MQS5) · Mequon · ISCorp19 mi · Operating
- Project Nova Data Center Campus (Caledonia) · Caledonia · Microsoft25 mi · Cancelled · Opposed
Questions people ask about this site
Is there opposition to the N15W24250 Riverwood Drive Data Centre (Pewaukee) in Pewaukee?
Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over N15W24250 Riverwood Drive Data Centre (Pewaukee) in Pewaukee, Waukesha County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the N15W24250 Riverwood Drive Data Centre (Pewaukee)?
No lawsuit over N15W24250 Riverwood Drive Data Centre (Pewaukee) appears in the record we track as of September 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does N15W24250 Riverwood Drive Data Centre (Pewaukee) use?
No water withdrawal figure for N15W24250 Riverwood Drive Data Centre (Pewaukee) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates N15W24250 Riverwood Drive Data Centre (Pewaukee), and how big is it?
Mapletree Redwood Data Centre Trust is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "N15W24250 Riverwood Drive Data Centre (Pewaukee)," updated September 13, 2026, https://suedatacenters.org/data-centers/mapletree-riverwood-pewaukee-wi.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/mapletree-riverwood-pewaukee-wi, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Mapletree: N15 W24250 Riverwood Data Center, ownership history and status · Baxtel · retrieved September 13, 2026
- 2.Wisconsin Data Centers & Colocation (lists N15 W24250 Riverwood at 142,952 sq ft, ~40,000 sq ft gross) · Baxtel · retrieved September 13, 2026
- 3.OpenStreetMap/Nominatim geocode of N15W24250 Riverwood Drive, Riverwood Corporate Center, City of Pewaukee (coordinate provenance) · OpenStreetMap contributors · retrieved September 13, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us