Oppidan Beaver Dam Edge Data Center is a permitted data center in Beaver Dam, Wisconsin (Dodge County), operated by Oppidan Investment Company. The public record puts it at announced February 2026, 14 acres. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- Oppidan Investment Company
- Facility type
- Data center
- Location
- Highway 151 and Hemlock Road, Beaver Dam, Dodge County, WI
- Coordinates
- 43.4578, -88.8373 (approximate)
- Power capacity
- Not established from a public source
- Land
- 14 acres
- Investment
- Not established from a public source
- Announced
- February 2026
- Utility
- Alliant Energy
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- 0.0059 million gallons a day, reported
- Jobs
- 15 permanent
- Public subsidy
- Not established from a public source
- Community reception
- Contested
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- April 7, 2026PermittedBeaver Dam Common Council voted 11-3 to authorize a development agreement and the sale of slightly more than 14 acres of city land near Highway 151 and Hemlock Road for $407,340; construction set to begin summer 2026 with the facility online in 2028. Source: Daily Dodge
Opposition and litigation at this site
Yes. Oppidan Beaver Dam Edge Data Center in Beaver Dam, Dodge County, Wisconsin is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. At the February 2026 council presentation about a dozen speakers opposed the plan, citing secrecy around Meta's nearby project, water and energy use, and property values.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
At the February 2026 council presentation about a dozen speakers opposed the plan, citing secrecy around Meta's nearby project, water and energy use, and property values. The council later approved the development agreement and land sale.
Power and water
Alliant Energy sent the developer a letter listing what is needed for electric service, with an engineering review to follow a formal application. The developer projects under 20 MW at full build-out.
Estimated daily water usage of 5,929 gallons for the 90,000 sq ft facility, about 0.0059 million gallons per day. This is the project's own estimate as presented to the Beaver Dam City Council, not a measured figure, and the source does not identify a cooling method.
Notes on the record
A 90,000-square-foot single-story regional edge data center, a separate, much smaller project from Meta's ~700,000-square-foot Beaver Dam campus already tracked. Council deliberations raised water use, utility rates and tax-fairness concerns. Coordinates are a municipality-level locator; the site is at Highway 151 and Hemlock Road.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Meta Beaver Dam Data Center Campus · Beaver Dam · Metaunder 1 mile · Under construction · 220 MW · Mixed reception
- Stonebridge Pacific AI Data Center (Columbia County) · Pacific · Stonebridge29 mi · Cancelled
- QTS Dane County Hyperscale Campus (DeForest) · DeForest · QTS Data Centers29 mi · Cancelled · Opposed
Questions people ask about this site
Is there opposition to the Oppidan Beaver Dam Edge Data Center in Beaver Dam?
Yes. Oppidan Beaver Dam Edge Data Center in Beaver Dam, Dodge County, Wisconsin is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. At the February 2026 council presentation about a dozen speakers opposed the plan, citing secrecy around Meta's nearby project, water and energy use, and property values.
Has anyone filed a lawsuit over the Oppidan Beaver Dam Edge Data Center?
No lawsuit over Oppidan Beaver Dam Edge Data Center appears in the record we track as of October 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Oppidan Beaver Dam Edge Data Center use?
0.0059 million gallons a day is the reported figure on record. Estimated daily water usage of 5,929 gallons for the 90,000 sq ft facility, about 0.0059 million gallons per day.
Who operates Oppidan Beaver Dam Edge Data Center, and how big is it?
Oppidan Investment Company is the operator on record. We hold 5 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 14 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Oppidan Beaver Dam Edge Data Center," updated October 16, 2026, https://suedatacenters.org/data-centers/oppidan-beaver-dam-edge-wi.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/oppidan-beaver-dam-edge-wi, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Beaver Dam Common Council Approves Second Data Center · Daily Dodge · retrieved September 1, 2026
- 2.Second data center project proposed in Beaver Dam (90,000 sq ft, 13-acre site at Highway 151 and Hemlock Road, under 20 MW, 5,929 gallons/day estimated water use, 15 full-time jobs) · Wisconsin Public Radio · retrieved October 16, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us