Data Center Registry
CleanSpark Limestone Bitcoin Mining Facility (closed 2026)
Limestone, Washington County, Tennessee · All 25 CleanSpark sites
CleanSpark Limestone Bitcoin Mining Facility (closed 2026) is a cancelled crypto mining site in Limestone, Tennessee (Washington County), operated by CleanSpark, Inc. The public record puts it at announced 2020. It is or has been the subject of litigation over its siting, permitting, or operation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Cancelled
- Operator
- CleanSpark, Inc.
- Facility type
- Crypto mining
- Location
- Limestone, Washington County, TN
- Coordinates
- 36.2235, -82.6250 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- 2020
- Utility
- BrightRidge (TVA)
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- In litigation
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Yes. CleanSpark Limestone Bitcoin Mining Facility (closed 2026) in Limestone, Washington County, Tennessee is or has been the subject of litigation over its siting, permitting, or operation. Shut down 2026-03-28 under a 2023 Washington County lawsuit settlement over noise/zoning violations.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.
Shut down 2026-03-28 under a 2023 Washington County lawsuit settlement over noise/zoning violations.
Power and water
Powered under a 2020 BrightRidge (local power distributor) energy contract. Historically ran ~25 MW before the 2026 shutdown.
Notes on the record
Real, well-documented ex-GRIID site (25 MW per a 2020 BrightRidge/Red Dog LLC contract) that CleanSpark inherited in the Oct 2024 GRIID acquisition, but which PERMANENTLY CEASED OPERATIONS on 2026-03-28 under a 2023 Washington County lawsuit settlement over noise/zoning violations. The schema has no 'decommissioned' status; 'cancelled' is used as the closest fit for a shut-down facility. Illustrative of the community-opposition dimension of crypto mining. Cancelled status re-confirmed 2026-09-09: the closure deadline set by the 2023 settlement passed in March 2026 and no source reports the site reopening. capacityMw left unset - a 25 MW figure circulates in search summaries but could not be quoted from any page fetched in this run.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the CleanSpark Limestone Bitcoin Mining Facility (closed 2026) in Limestone?
Yes. CleanSpark Limestone Bitcoin Mining Facility (closed 2026) in Limestone, Washington County, Tennessee is or has been the subject of litigation over its siting, permitting, or operation. Shut down 2026-03-28 under a 2023 Washington County lawsuit settlement over noise/zoning violations.
Has anyone filed a lawsuit over the CleanSpark Limestone Bitcoin Mining Facility (closed 2026)?
Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.
How much water does CleanSpark Limestone Bitcoin Mining Facility (closed 2026) use?
No water withdrawal figure for CleanSpark Limestone Bitcoin Mining Facility (closed 2026) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates CleanSpark Limestone Bitcoin Mining Facility (closed 2026), and how big is it?
CleanSpark, Inc. is the operator on record. We hold 25 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "CleanSpark Limestone Bitcoin Mining Facility (closed 2026)," updated September 9, 2026, https://suedatacenters.org/data-centers/cleanspark-limestone-tn.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cleanspark-limestone-tn, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.County OKs Bitcoin mine lawsuit settlement after gaining concessions · WJHL Tri-Cities News · retrieved August 5, 2026
- 2.Noisy Bitcoin mine shuts down in Washington County, TN · WJHL / Yahoo News · retrieved August 5, 2026
- 3.CleanSpark Announces Agreement to Acquire GRIID Infrastructure · PR Newswire (CleanSpark, Inc.) · retrieved August 5, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us