Data Center Registry
Colossus
Memphis, Shelby County, Tennessee · All 5 xAI sites · Every xAI case on our tracker
Colossus is an operating data center in Memphis, Tennessee (Shelby County), operated by xAI. The public record puts it at announced 2024, 1.2 GW planned, a reported $12 billion investment. It is or has been the subject of litigation over its siting, permitting, or operation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- xAI
- Facility type
- Data center, AI use confirmed
- Location
- Memphis, Shelby County, TN
- Coordinates
- 35.0565, -90.0148
- Power capacity
- 150 MW operating; 1.2 GW planned
- Land
- Not established from a public source
- Investment
- $12 billion
- Announced
- 2024
- Utility
- Memphis Light Gas & Water (MLGW) / TVA
- Power source
- Mixed
- On site generation
- 422 MW
- Cooling
- Evaporative
- Water use
- 3 million gallons a day, reported
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- In litigation
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 11, 2026Coverage
- September 2024OperatingPhase 1 online with ~100,000 NVIDIA H100 GPUs; later expanded with H200s Source: Reuters
- June 2024Under constructionConstruction began; completed in approximately 122 days Source: Wikipedia
Opposition and litigation at this site
Yes. Colossus in Memphis, Shelby County, Tennessee is or has been the subject of litigation over its siting, permitting, or operation. The NAACP (with SELC and Earthjustice) sued xAI over roughly 35 unpermitted methane gas turbines; the county permitted only 15, and the Memphis and Shelby County Air Pollution Control Board dismissed the NAACP/Young, Gifted & Green appeal of that permit as moot on 2025-12-15 (6-1).
How the community has taken it
Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.
The NAACP (with SELC and Earthjustice) sued xAI over roughly 35 unpermitted methane gas turbines; the county permitted only 15, and the Memphis and Shelby County Air Pollution Control Board dismissed the NAACP/Young, Gifted & Green appeal of that permit as moot on 2025-12-15 (6-1). The permit drew 1,700+ public comments, most opposed, and South Memphis (Boxtown) residents already face elevated asthma and cancer rates. xAI did not pursue a Shelby County EDGE PILOT tax abatement; no public subsidy is on record.
Power and water
About 35 on-site natural-gas turbines (a combined 422 MW per SELC and aerial imagery) supplement a 150 MW grid substation and Tesla Megapack storage. The Shelby County Health Department permitted only 15 turbines; the SELC/NAACP/Young, Gifted & Green appeal of that permit was dismissed as moot by the Memphis and Shelby County Air Pollution Control Board on a 6-1 vote on 2025-12-15 (after the health department and xAI argued most turbines had been removed), ending the appeal-triggered stay and leaving the permit in force; press at the time reported 12 SCR-equipped turbines still active and a permit expiring 2027-01-02. TVA's board voted unanimously on 2026-02-11 to approve an additional 150 MW of firm power, which would double the approved grid allocation to about 300 MW; that approval is contingent on contractual, financial and operational requirements and is a ceiling, not delivered power, as of 2026-09-23 no source reports the second increment energized, and the site is still described as taking 150 MW from the grid. xAI said the Phase-I temporary turbines would be demobilized after grid connection, but 2025 aerial imagery shows 35 on site.
The open cooling loop's design draw is roughly 3 MGD from the Memphis Sands aquifer via MLGW (xAI engineer, per Governing), though Protect Our Aquifer reported a lower early-operational actual of ~0.8 MGD (~812,000 gal/day) in early 2025 as the site was still ramping. xAI broke ground in Oct 2025 on an $80M greywater-recycling plant at the T.E. Maxson wastewater facility (targeting ~10 MGD of treated wastewater); construction was later paused.
People and entities in the record
Elon Musk · executive via xAI
Runs xAI, the company operating this facility; CNBC, reporting the Shelby County turbine-permit appeal, describes "xAI, which is run by Elon Musk" as having set up in Memphis in 2024.
Source
Notes on the record
xAI did not obtain a PILOT or any other formally granted incentive for the Memphis site, unlike the usual Memphis path, so no subsidy is recorded, as a known absence rather than an unknown; the site is instead expected to pay more than $30 million in combined Memphis and Shelby County property taxes. A federal Clean Air Act suit filed 2026-04-14 (NAACP v. X.AI Corp. and MZX Tech LLC, No. 3:26-cv-00074, N.D. Miss.) targets xAI's separate 'Colossus Gas Plant' in Southaven, Mississippi (MZX Tech LLC, 2875 Stanton Road South), not this site or CTC Property LLC; it cites this site's turbine history only as background. Permit-level detail for this site's turbines, including that the permit covers 15 turbines on a permanent basis, is in the companion record CTC Property Gas Turbine Plant (Colossus 1).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Colossus 2 (Whitehaven) · Memphis · xAI4 mi · Operating
- Minihard · Memphis · xAI4 mi · Under construction
- MACROHARDRR (xAI Southaven) · Southaven · xAI4 mi · Under construction
- 5C MEM01 Memphis (former Fred's headquarters) · Memphis · 5C Data Centers5 mi · Operating · 20 MW
- xAI Tulane Road Data Center (Southaven) · Southaven · xAI (SpaceXAI)5 mi · Permitted
- Neural Nexus Innovation District · Memphis · Legacy Power Capital6 mi · Proposed · Mixed reception
- EdgeConneX Memphis (EDCMEM01) · Memphis · EdgeConneX7 mi · Operating
- Connect Data Centers Memphis (3900 S. Mendenhall Road) · Memphis · Connect Data Centers (Oppidan Investment Company)8 mi · Operating
Questions people ask about this site
Is there opposition to the Colossus data center in Memphis?
Yes. Colossus in Memphis, Shelby County, Tennessee is or has been the subject of litigation over its siting, permitting, or operation. The NAACP (with SELC and Earthjustice) sued xAI over roughly 35 unpermitted methane gas turbines; the county permitted only 15, and the Memphis and Shelby County Air Pollution Control Board dismissed the NAACP/Young, Gifted & Green appeal of that permit as moot on 2025-12-15 (6-1).
Has anyone filed a lawsuit over the Colossus data center?
Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.
How much water does Colossus use?
3 million gallons a day is the reported figure on record. Cooling is recorded as evaporative. The open cooling loop's design draw is roughly 3 MGD from the Memphis Sands aquifer via MLGW (xAI engineer, per Governing), though Protect Our Aquifer reported a lower early-operational actual of ~0.8 MGD (~812,000 gal/day) in early 2025 as the site was still ramping.
Who operates Colossus, and how big is it?
xAI is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 1.2 GW.
How to cite this page
SueDataCenters.org Data Center Registry, "Colossus," updated October 16, 2026, https://suedatacenters.org/data-centers/xai-colossus-memphis-tn.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/xai-colossus-memphis-tn, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Colossus (supercomputer), Wikipedia · Wikipedia · retrieved August 16, 2026
- 2.Musk says xAI has built world's most powerful AI training cluster, Reuters · Reuters · retrieved July 5, 2026 · original offline, no archived copy found
- 3.xAI doubles number of on-site gas turbines at Memphis data center in violation of permit limits, Data Center Dynamics · Data Center Dynamics · retrieved July 6, 2026
- 4.Wastewater Will Cool This Memphis Data Center, Governing · Governing · retrieved July 6, 2026
- 5.Musk's xAI permits challenged by NAACP, environmental groups in Memphis, CNBC · CNBC · retrieved July 6, 2026
- 6.Here's what xAI will pay in property taxes · Daily Memphian · retrieved September 9, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us