EdgeConneX Memphis (EDCMEM01)
Memphis, Shelby County, Tennessee · All 21 EdgeConneX sites · Every EdgeConneX case on our tracker
EdgeConneX Memphis (EDCMEM01) is an operating data center in Memphis, Tennessee (Shelby County), operated by EdgeConneX.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- EdgeConneX
- Facility type
- Data center
- Location
- 4005 S Mendenhall Road, Memphis, Shelby County, TN, 38115
- Coordinates
- 35.0390, -89.8862 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 14, 2026Operating16,700 sq ft Edge Data Center with 5,633 sq ft of raised-floor tenant space, supporting 20+ kW per cabinet and 600+ W per sq ft, N+1 PDUs/UPS/generators; ENERGY STAR certified. Source: EdgeConneX
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX Memphis (EDCMEM01) in Memphis, Shelby County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Distinct from the tracked EdgeConneX NAS01 Nashville record (1841 Air Lane Drive, Nashville), same operator, different metro and building. No MW figure is recorded: EdgeConneX publishes per-cabinet and per-sq-ft density, not a facility IT load.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Connect Data Centers Memphis (3900 S. Mendenhall Road) · Memphis · Connect Data Centers (Oppidan Investment Company)under 1 mile · Operating
- Merkle Standard Memphis (4545 South Mendenhall Road) · Memphis · Merkle Standard1 mi · Operating
- 5C MEM01 Memphis (former Fred's headquarters) · Memphis · 5C Data Centers3 mi · Under construction · 15 MW
- xAI Southaven · Southaven · xAI6 mi · Operating · 2 GW · In litigation
- Expedient Memphis (MEM1) · Memphis · Expedient6 mi · Operating · 1.5 MW
- Colossus · Memphis · xAI7 mi · Operating · 1.2 GW · In litigation
- The STEM Practice Sycamore View AI Data Center · Memphis · Golden Acquisitions / The STEM Practice9 mi · Under construction · 9 MW
- Colossus 2 (Whitehaven) · Memphis · xAI9 mi · Operating · 210 MW
Questions people ask about this site
Is there opposition to the EdgeConneX Memphis (EDCMEM01) data center in Memphis?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX Memphis (EDCMEM01) in Memphis, Shelby County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the EdgeConneX Memphis (EDCMEM01) data center?
No lawsuit over EdgeConneX Memphis (EDCMEM01) appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does EdgeConneX Memphis (EDCMEM01) use?
No water withdrawal figure for EdgeConneX Memphis (EDCMEM01) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates EdgeConneX Memphis (EDCMEM01), and how big is it?
EdgeConneX is the operator on record. We hold 21 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "EdgeConneX Memphis (EDCMEM01)," updated September 14, 2026, https://suedatacenters.org/data-centers/edgeconnex-mem01-memphis-tn.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgeconnex-mem01-memphis-tn, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.PeeringDB facility 1930, EdgeConneX Memphis (EDCMEM01), 4005 S Mendenhall Rd, Memphis · PeeringDB · retrieved September 14, 2026
- 2.EdgeConneX Memphis (MEM01) facility specifications · EdgeConneX · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us