Colossus 2 (Whitehaven)
Memphis, Shelby County, Tennessee · All 5 xAI sites · Every xAI case on our tracker
Colossus 2 (Whitehaven) is an operating data center in Memphis, Tennessee (Shelby County), operated by xAI. The public record puts it at 100 acres, a reported $80 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- xAI
- Facility type
- Data center, AI use confirmed
- Location
- 5400 Tulane Road, Memphis, Shelby County, TN
- Coordinates
- 34.9980, -90.0349 (approximate)
- Power capacity
- Not established from a public source
- Land
- 100 acres
- Investment
- $80 million
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 11, 2026Coverage
- January 2026OperatingFirst major GPU cluster, about 110,000 Nvidia GB200-class processors and roughly 210 MW, came online after a build of about 91 days. Source: Wikipedia
- February 2025ProposedxAI affiliate CTC Properties buys three parcels on Tulane Road in Whitehaven for about $80m. Source: DataCenterDynamics (archived)
Opposition and litigation at this site
Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Colossus 2 (Whitehaven) in Memphis, Shelby County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Second, physically separate xAI Memphis site, distinct from the Colossus campus at 3231 Paul R Lowry Road in Boxtown. DCD (2025-03-10) reports xAI affiliate CTC Properties bought three parcels at 5400 Tulane Road in Whitehaven for $80m: an existing 1 million sq ft warehouse plus two adjacent sites totalling 100 acres. The $80m figure is the land purchase price recorded in property records, not total project investment. ADDRESS DISCREPANCY: DCD gives 5400 Tulane Road; Wikipedia gives 5420 Tulane Road. 5400 is recorded because it is the figure in the earlier, better-attributed source, and the coordinates are a geocode of that address, not a confirmed parcel boundary. Status moved to operational on Wikipedia's account that the first major cluster came online around January 2026; Wikipedia is a weak source and this is the reason confidence stays at 'confirmed' only for the site's existence, not for its capacity. No capacityMw is recorded: Memphis Light Gas and Water was asked for a system-impact study for up to 260MW and xAI's Brent Mayo said the site could host up to 350,000 GPUs, but both are stated intentions, and the widely quoted 1 GW / 2 GW figures were not confirmed in any source fetched for this record. POWER IS LARGELY OUT OF STATE: the behind-the-meter gas-turbine plant reported to serve this site sits at Stanton Road in Southaven, MISSISSIPPI, so it is not a Tennessee facility and is deliberately not recorded here. PIN CORRECTED 2026-09-13: the previous coordinate (34.999654,-90.04295) was a bare OSM address POINT for 5400 Tulane Road (place=house, ~11m x 9m, no building geometry), sitting 759 m from the warehouse it was meant to mark. The pin is now the centroid of OSM building way 1386926534, explicitly tagged name="xAI Macrohard Colossus 2", operator=xAI, telecom=data_center, addr:housenumber=5420 (way version 3, last edited 2025-12-31). Its footprint measures 511 m x 176 m = 969,472 sq ft, matching the 1 million sq ft warehouse this record describes to within 3%, and Nominatim resolves "5420 Tulane Road" directly to it. This also RESOLVES the address discrepancy above rather than choosing a side: 5400 is the property-record address for the three-parcel, 100-acre assemblage (kept in location.street, per the cited DCD source), while 5420 is the warehouse building itself. precision remains "approximate": the pin is a crowd-sourced OSM footprint corroborated by Wikipedia, NOT a parcel-confirmed point -- Shelby County assessor records returned 403 and could not be checked. Upgrading to "exact" needs that parcel record.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- MACROHARDRR (xAI Southaven Data Center III) · Southaven · xAIunder 1 mile · Operating
- Minihard · Memphis · xAIunder 1 mile · Under construction
- xAI Southaven · Southaven · xAI3 mi · Operating · 2 GW · In litigation
- Colossus · Memphis · xAI4 mi · Operating · 1.2 GW · In litigation
- 5C MEM01 Memphis (former Fred's headquarters) · Memphis · 5C Data Centers6 mi · Proposed · 15 MW
- Neural Nexus Innovation District · Memphis · Legacy Power Capital10 mi · Proposed · Mixed reception
- Google West Memphis Data Center Campus · West Memphis · Google13 mi · Under construction · Supported
- The STEM Practice Sycamore View AI Data Center · Memphis · Golden Acquisitions / The STEM Practice15 mi · Under construction
Questions people ask about this site
Is there opposition to the Colossus 2 (Whitehaven) data center in Memphis?
Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Colossus 2 (Whitehaven) in Memphis, Shelby County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Colossus 2 (Whitehaven) data center?
No lawsuit over Colossus 2 (Whitehaven) appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Colossus 2 (Whitehaven) use?
No water withdrawal figure for Colossus 2 (Whitehaven) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Colossus 2 (Whitehaven), and how big is it?
xAI is the operator on record. We hold 5 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 100 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Colossus 2 (Whitehaven)," updated September 9, 2026, https://suedatacenters.org/data-centers/xai-colossus-2-memphis-tn.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/xai-colossus-2-memphis-tn, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Elon Musk's xAI buys 1 million sq ft site for second Memphis data center · DataCenterDynamics (archived) · retrieved September 9, 2026
- 2.Colossus (data center) · Wikipedia · retrieved September 9, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us