OperatingNo reception on recordAI confirmedRecord updated October 28, 2026

Colossus 2 (Whitehaven) is an operating data center in Memphis, Tennessee (Shelby County), operated by xAI. The public record puts it at 100 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
xAI
Facility type
Data center, AI use confirmed
Location
5400 Tulane Road, Memphis, Shelby County, TN
Coordinates
34.9980, -90.0349 (approximate)
Power capacity
Not established from a public source
Land
100 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 11, 2026
    Coverage
  2. October 2025
    Operating
    Epoch AI matches its 2025-10-19 satellite imagery to the first cluster described in SpaceX's S-1 filing (p. 76): "approximately 110,000 GB200 processors, approximately 210 megawatts of compute power." Source: Epoch AI
  3. February 2025
    Proposed
    xAI affiliate CTC Properties buys three parcels on Tulane Road in Whitehaven for about $80m. Source: DataCenterDynamics (archived)

Opposition and litigation at this site

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Colossus 2 (Whitehaven) in Memphis, Shelby County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

Second, physically separate xAI Memphis site, distinct from the Colossus campus at 3231 Paul R Lowry Road in Boxtown. DCD (2025-03-10) reports xAI affiliate CTC Properties bought three parcels at 5400 Tulane Road in Whitehaven for $80m: an existing 1 million sq ft warehouse plus two adjacent sites totalling 100 acres. The $80m figure is the land purchase price recorded in property records, not total project investment. 5400 Tulane Road (DCD) is the property-record address for the three-parcel, 100-acre assemblage; 5420 Tulane Road (Wikipedia) is the warehouse building itself. No operational capacity is recorded. An S-1 filing describes the first cluster as "approximately 110,000 GB200 processors, approximately 210 megawatts of compute power", as quoted by Epoch AI; the figure is stated as approximate, the filing does not define the term, and Epoch AI says it believes "compute power" corresponds to GPU server power. Larger figures are stated intentions, not recorded capacity: Memphis Light Gas and Water was asked for a system-impact study for up to 260 MW, xAI's Brent Mayo said the site could host up to 350,000 GPUs, and the widely quoted 1 GW and 2 GW figures are unconfirmed. The gas-turbine power plant reported to serve this site is on Stanton Road in Southaven, Mississippi, and, as of October 2026, is tracked separately as Colossus 2 power station. The pin is the centroid of the OpenStreetMap building tagged "xAI Macrohard Colossus 2" (operator xAI, 5420 Tulane Road). It is a crowd-sourced footprint, not a parcel-confirmed point, so its precision is approximate.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Colossus 2 (Whitehaven)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Colossus 2 (Whitehaven) data center in Memphis?

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Colossus 2 (Whitehaven) in Memphis, Shelby County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Colossus 2 (Whitehaven) data center?

No lawsuit over Colossus 2 (Whitehaven) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Colossus 2 (Whitehaven) use?

No water withdrawal figure for Colossus 2 (Whitehaven) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Colossus 2 (Whitehaven), and how big is it?

xAI is the operator on record. We hold 5 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 100 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Colossus 2 (Whitehaven)," updated October 28, 2026, https://suedatacenters.org/data-centers/xai-colossus-2-memphis-tn.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/xai-colossus-2-memphis-tn, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Elon Musk's xAI buys 1 million sq ft site for second Memphis data center · DataCenterDynamics (archived) · retrieved September 9, 2026 · original offline, no archived copy found
  2. 2.Colossus (data center) · Wikipedia · retrieved September 21, 2026
  3. 3.Colossus 2 | AI data centers · Epoch AI · retrieved October 16, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us