Hixson Data Center (McMinnville) is a proposed data center in McMinnville, Tennessee (Warren County), operated by Hixson Data Center. The public record puts it at 25 MW planned. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Hixson Data Center
Facility type
Data center
Location
McMinnville, Warren County, TN
Coordinates
35.6834, -85.7700 (approximate)
Power capacity
25 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
On site gas
On site generation
30 MW
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Yes. Organized local opposition to Hixson Data Center (McMinnville) in McMinnville, Warren County, Tennessee is documented in the public record, without a lawsuit on file in the sources we track.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

Power and water

Bloom Energy solid-oxide fuel cells sized at 33.15 MW nameplate / 30.0 MW guaranteed, fed by Middle Tennessee Natural Gas, plus a 25 MW BESS and 8 x 4.4 MW continuous diesel generators for backup.

Direct-to-chip CDUs on a 25% propylene glycol circuit plus chilled-water AHUs and economizer heat exchangers - a recirculating water/glycol circuit, so closed_loop rather than air. No water-consumption figure is published.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Questions people ask about this site

Is there opposition to the Hixson Data Center (McMinnville) in McMinnville?

Yes. Organized local opposition to Hixson Data Center (McMinnville) in McMinnville, Warren County, Tennessee is documented in the public record, without a lawsuit on file in the sources we track.

Has anyone filed a lawsuit over the Hixson Data Center (McMinnville)?

No lawsuit over Hixson Data Center (McMinnville) appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Hixson Data Center (McMinnville) use?

No water withdrawal figure for Hixson Data Center (McMinnville) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Hixson Data Center (McMinnville), and how big is it?

Hixson Data Center is the operator on record. Capacity on record is 25 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Hixson Data Center (McMinnville)," updated September 9, 2026, https://suedatacenters.org/data-centers/hixson-data-center-mcminnville-tn.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/hixson-data-center-mcminnville-tn, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.25MW AI Data Center Planned for McMinnville · Baxtel · retrieved August 14, 2026
  2. 2.Amid plans for new 'high-density' AI data center campus in a Middle Tennessee city, locals push for moratorium on such facilities · WSMV News 4 Nashville · retrieved August 14, 2026
  3. 3.Hixson Data Center - Secure Data Room (project specifications) · Hixson Data Center · retrieved September 9, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us