EdgeConneX CHI02 is an operating data center in Elk Grove Village, Illinois (Cook County), operated by EdgeConneX. The public record puts it at 7 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- EdgeConneX
- Facility type
- Data center, AI use likely
- Location
- 2021 Lunt Avenue, Elk Grove Village, Cook County, IL, 60007
- Coordinates
- 42.0015, -87.9526
- Power capacity
- 7 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- ComEd
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX CHI02 in Elk Grove Village, Cook County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
EDCCHI02 is a specific, addressed EdgeConneX facility at 2021 Lunt Avenue, Elk Grove Village, IL, in ComEd territory, part of the Chicago-area cluster where ComEd has been actively expanding substation capacity (e.g., the Elk Grove substation expansion) to serve data-center load growth.
Notes on the record
Confirmed distinct from CHI01 (osm_id 174242795) on the same official page: CHI02 operational, 7MW N+1, 282,000 sq ft raised floor for tenants. AI/HPC (likely): EdgeConneX and Lambda announced a 23MW single-tenant liquid-cooled AI Factory on EdgeConneX's Chicago (Elk Grove Village) campus for high-density AI/HPC workloads.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Microsoft Elk Grove Data Center · Elk Grove Village · Microsoftunder 1 mile · Under construction
- Digital Realty CH2 · Elk Grove Village · Digital Realtyunder 1 mile · Operating
- Digital Realty Chicago CH1 · Elk Grove Village · Digital Realtyunder 1 mile · Operating
- Centersquare ORD2 (Elk Grove Village) · Elk Grove Village · Centersquare (Csquare)under 1 mile · Operating · 25.9 MW
- STACK CHI01 · Elk Grove Village · STACK Infrastructureunder 1 mile · Operating · 40 MW
- Aligned ORD-03 · Elk Grove Village · Aligned Data Centersunder 1 mile · Under construction
- Stream Chicago I (ORDA) · Elk Grove Village · Stream Data Centersunder 1 mile · Operating · 31 MW
- Stream Chicago III (ORDC) · Elk Grove Village · Stream Data Centersunder 1 mile · Under construction · 40 MW
Questions people ask about this site
Is there opposition to the EdgeConneX CHI02 data center in Elk Grove Village?
Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX CHI02 in Elk Grove Village, Cook County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the EdgeConneX CHI02 data center?
No lawsuit over EdgeConneX CHI02 appears in the record we track as of July 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does EdgeConneX CHI02 use?
No water withdrawal figure for EdgeConneX CHI02 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates EdgeConneX CHI02, and how big is it?
EdgeConneX is the operator on record. We hold 16 sites for that company across the registry. Capacity on record is 7 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "EdgeConneX CHI02," updated July 24, 2026, https://suedatacenters.org/data-centers/edgeconnex-chi02-il.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgeconnex-chi02-il, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.EdgeConneX official locations page - Chicago · EdgeConneX · retrieved July 22, 2026
- 2.OpenStreetMap way/377032058 · OpenStreetMap · retrieved July 22, 2026
- 3.EdgeConneX AI/HPC, EdgeConneX and Lambda announced a 23MW single-tenant liquid-cooled AI · edgeconnex.com · retrieved July 23, 2026
- 4.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
- 5.Lambda, "EdgeConneX and Lambda To Build AI Factory In Chicago" (official announcement) · retrieved July 24, 2026
- 6.Inflect, EdgeConneX EDCCHI02, 2021 Lunt Avenue, Elk Grove Village IL · retrieved July 24, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.