State Guide
Data Centers in Illinois: Lawsuits, Disputes, and Your Rights
Illinois is a major data center market anchored by Chicago and Elk Grove Village, one of the densest data center suburbs in America, backed by strong state incentives. No litigation is documented yet; here is what Illinois residents should watch for and how to tell us about your situation.

fields rezoned for a data center campus in Grayslake, Illinois, photographed 2019-08-09. Saddlebrook Farms on the west side of Alleghany Road, and the open fields across from it where 472 acres lost their residential zoning in about a minute. The imagery predates the vote.
USDA Farm Service Agency / USGS National Map, National Agriculture Imagery Program. Cropped from NAIP 0.6 m aerial imagery, scene m_4208848_ne_16_060_20190809. (original)
Illinois at a glance
Major market
- Market size
- Major; among the largest data center markets in the country
- Hot spots
- Chicago and its suburbs, above all Elk Grove Village, one of the densest data center concentrations in America
- Key operators
- Major colocation and hyperscale operators cluster around Chicago's fiber and power infrastructure
- Documented disputes
- Joliet Residents For Responsible Growth v. City of Joliet, filed May 18, 2026 over the 795 acre, 1.8 gigawatt Joliet Technology Center rezoning, pending in Will County; Preservation of Community Well-being Collective v. Village of Grayslake and T5 Data Centers, filed July 31, 2026 over the 472 acre T5@Chicago IV campus, pending in Lake County
- Statewide action
- Strong state incentives for data center investment; no moratorium or litigation documented
Key Takeaways
- Illinois is one of the largest data center markets in the country, anchored by Chicago and the extraordinary concentration in Elk Grove Village, yet no data center lawsuit is documented in the state as of August 2026.
- Strong state incentives keep the buildout accelerating, which means more projects, bigger power demands, and, if the national pattern holds, eventual friction with neighbors.
- The Illinois footprint has historically lived in industrial suburbs built for it; the risk profile changes as AI-scale projects look for large parcels in collar counties and downstate.
- Illinois residents affected by a facility hold the standard toolkit: private nuisance claims, zoning appeals, and ordinance enforcement, backed by early documentation.
- Grid cost allocation is the sleeper issue: fights over who pays for data center electricity infrastructure have reached courts in Ohio and Wisconsin, and Illinois households have the same stake.
Data centers in Illinois, from the registry
All 80 sites80 sites on the public record: 41 operating, 15 under construction, 9 permitted, 8 proposed, 7 cancelled. 11 carry documented opposition or litigation. 12.3 GW planned.
By county, alphabetically. Each profile carries capacity, land, utility, water, subsidies, jobs, a timeline, and every source.
Christian County (1 site)
- Meridian Technology Park · Clarksdale · Eagle Rock PartnersCancelled · 1 GW · Contested
Cook County (44 sites)
- Prime ORD Chicago Campus · Elk Grove Village · Prime Data CentersUnder construction · 175 MW · Supported
- Related Digital South Works Campus (8080 S DuSable Lake Shore Drive) · Chicago · Related DigitalProposed · 1 GW
- TA Realty Elk Grove Village Data Center · Elk Grove Village · TA RealtyUnder construction · 250 MW
- Microsoft Northlake Data Center · Northlake · MicrosoftOperating · 158 MW
- Metro Edge IMD1 · Chicago · Metro Edge Development PartnersPermitted · 53 MW
- Aligned ORD-01 · Northlake · Aligned Data CentersOperating · 48 MW
- STACK CHI01 · Elk Grove Village · STACK InfrastructureOperating · 40 MW
- Stream Chicago III (ORDC) · Elk Grove Village · Stream Data CentersUnder construction · 40 MW
- Iron Mountain CHI-1 · Des Plaines · Iron Mountain Data CentersOperating · 36 MW
- T5 @ Chicago III (Northlake) · Northlake · T5 Data CentersUnder construction · 36 MW
- T5 @ Chicago V (CHI V) · Elk Grove Village · T5 Data CentersPermitted · 36 MW
- Stream Chicago II (ORDB) · Elk Grove Village · Stream Data CentersOperating · 32 MW
- Stream Chicago I (ORDA) · Elk Grove Village · Stream Data CentersOperating · 31 MW
- Skybox Chicago I · Elk Grove Village · Skybox DatacentersOperating · 30 MW
- Lambda Chicago EdgeConneX AI Factory · Chicago · LambdaUnder construction · 23 MW
- Serverfarm CH1 · Chicago · ServerfarmOperating · 21.5 MW
- HydraVault Chicago · Chicago · HydraVaultUnder construction · 20 MW
- CoreSite CH2 · Chicago · CoreSiteOperating · 18 MW
- Menlo Digital Chicago Exchange (601 West Polk) · Chicago · Menlo Digital (Menlo Equities)Operating · 8 MW
- EdgeConneX CHI02 · Elk Grove Village · EdgeConneXOperating · 7 MW
- DataBank ORD3 (Mount Prospect) · Mount Prospect · DataBankOperating · 2.7 MW
- Aligned ORD-02 · Northlake · Aligned Data CentersOperating
- Aligned ORD-03 · Elk Grove Village · Aligned Data CentersUnder construction
- Centersquare ORD1 (Chicago Cermak) · Chicago · Centersquare (Csquare)Operating
- CloudHQ Mount Prospect (ORD) Campus · Mount Prospect · CloudHQUnder construction
- Compass Datacenters Hoffman Estates Campus · Hoffman Estates · Compass DatacentersUnder construction
- CoreSite CH1 · Chicago · CoreSiteOperating
- Digital Realty CH2 · Elk Grove Village · Digital RealtyOperating
- Digital Realty CH3 · Elk Grove Village · Digital RealtyOperating
- Digital Realty Chicago CH1 · Elk Grove Village · Digital RealtyOperating
- Digital Realty ORD10 · Chicago · Digital RealtyOperating
- Digital Realty ORD11 · Chicago · Digital RealtyOperating
- Digital Realty ORD12 · Franklin Park · Digital RealtyOperating
- Digital Realty ORD13 · Franklin Park · Digital RealtyOperating
- Digital Realty ORD14 · Franklin Park · Digital RealtyOperating
- Digital Realty ORD23 · Northlake · Digital RealtyOperating
- Equinix CH1 · Chicago · EquinixOperating
- Karis Critical Hoffman Estates Data Center (Plum Farms) · Hoffman Estates · Karis Critical (H.E. Holdings LLC)Cancelled
- Microsoft Elk Grove Data Center · Elk Grove Village · MicrosoftUnder construction
- Microsoft Hoffman Estates Data Center · Hoffman Estates · MicrosoftOperating
- Netrality 717 South Wells · Chicago · Netrality Data CentersOperating
- Oracle Elk Grove Village Data Center · Elk Grove Village · OracleProposed
- QTS Chicago 1 · Chicago · QTS Data CentersOperating
- T5 Chicago II · Elk Grove Village · T5 Data CentersOperating
DeKalb County (3 sites)
- Meta DeKalb Data Center · DeKalb · MetaOperating · Supported
- Edged DeKalb Campus (Project Vector) · DeKalb · Edged (Endeavour Energy)Permitted
- KARIS DeKalb Campus (Peace and Gurler Roads) · DeKalb · Karis AcquisitionsPermitted
DuPage County (10 sites)
- Karis Critical Naperville Data Center · Naperville · Karis CriticalCancelled · 36 MW · Opposed
- Edged Chicago Campus, Aurora (ORD01) · Aurora · Edged USUnder construction · 72 MW · Mixed reception
- Centersquare ORD4 (Lisle) · Lisle · Centersquare (Csquare)Operating · 88.9 MW
- NTT Chicago CH1 Data Center · Itasca · NTT Global Data CentersOperating · 36 MW
- NTT Chicago CH2 Data Center · Itasca · NTT Global Data CentersOperating · 36 MW
- CyrusOne Wood Dale Campus · Wood Dale · CyrusOneUnder construction · 18 MW
- DataBank ORD4 (Chicago Tri-State) · Oak Brook · DataBankOperating · 8.75 MW
- Element Critical Chicago One · Wood Dale · Element CriticalOperating · 7 MW
- Element Critical Chicago Two · Wood Dale · Element CriticalOperating · 5 MW
- Equinix CH7 · Westmont · EquinixOperating
Grundy County (3 sites)
- Aligned Coal City Campus · Coal City · Aligned Data CentersProposed · Contested
- Morris Technology Park · Morris · TractPermitted · 1 GW · Supported
- Equinix CH8 Minooka · Minooka · EquinixProposed
Kane County (3 sites)
- Project Kilo Data Center (South Elgin) · South Elgin · White Rose PartnersProposed · Opposed
- Hut 8 Batavia Data Center · Batavia · Batavia DC Corp (Hut 8 Corp subsidiary)Under construction · 50 MW · Mixed reception
- CyrusOne CHI1-CHI3 (Aurora) · Aurora · CyrusOneOperating · 109 MW
Kendall County (3 sites)
- Project Cardinal Data Center Campus · Yorkville · Pioneer Development LLCPermitted · 1.8 GW · In litigation
- CyrusOne Yorkville Technology Campus (CHI-11) · Yorkville · CyrusOneUnder construction
- Project Steel Data Center Campus · Yorkville · PrologisPermitted
Lake County (2 sites)
- T5 Chicago IV (CHI IV) · Grayslake · T5 Data CentersUnder construction · 1.6 GW · In litigation
- Volo Data Center · Volo · Chirisa Technology ParksOperating · 14 MW
Logan County (1 site)
- Logan Prairie Data Center · Latham · Hut 8 CorpProposed · 500 MW
Madison County (1 site)
- Cloverleaf Troy Data Center Campus · Troy · Cloverleaf InfrastructureProposed · 500 MW · Mixed reception
Ogle County (1 site)
- Steward Drive Data Center (Rochelle) · Rochelle · Midwest Power Investors LLC (LFF Industrial)Cancelled · 150 MW · Opposed
Putnam County (1 site)
- Sangha Systems Hennepin (82 River North) · Hennepin · Sangha SystemsOperating · 82 MW
Sangamon County (1 site)
- CyrusOne Sangamon County Data Center Campus · CyrusOnePermitted · 630 MW · Contested
Tazewell County (1 site)
- Lutticken Farm Data Center (Pekin) · Pekin · Western Hospitality PartnersCancelled · Opposed
Will County (2 sites)
- Joliet Technology Center · Joliet · HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)Permitted · 1.8 GW · In litigation
- Star Innovation District Data Center (Lockport) · Lockport · VME DevelopersCancelled
County not on record (3 sites)
- Brennan Barrington Hills Data Center · Barrington Hills · Brennan Investment GroupCancelled · Opposed
- Rock Air Data Center Campus · Rockford · Monarch EnergyProposed · 1.4 GW
- Centersquare ORD2 (Elk Grove Village) · Elk Grove Village · Centersquare (Csquare)Operating · 25.9 MW
In this article
Illinois is a heavyweight in the data center world. Chicago's fiber crossroads and a strong state incentive program built one of the largest markets in the country, with Elk Grove Village near O'Hare holding one of the densest concentrations of data centers anywhere in America. And yet the state's legal docket is empty: no data center lawsuit, formal dispute, or moratorium fight is documented in Illinois as of August 2026. The reasons are mostly about siting, and the future is mostly about where the AI buildout goes next. Here is where Illinois stands, what could change, and what legal options residents have if a facility starts affecting their home.
The data center footprint in Illinois
Chicago is one of the great connectivity crossroads of North America, where fiber routes from both coasts meet, and its data center market grew up on that foundation. The signature cluster is Elk Grove Village, the industrial suburb beside O'Hare that has packed in one of the densest concentrations of data centers in the country. Downtown Chicago hosts carrier hotels and financial-trading infrastructure, and capacity spreads through the western and northwestern suburbs.
Illinois competes for this investment deliberately, with strong state incentives that have helped keep the buildout running. The historical pattern has been industrial: facilities in business parks zoned for them, surrounded by warehouses rather than backyards. That is a big part of why Illinois has none of the litigation now filling dockets in Virginia, Georgia, and Wisconsin. The open question is whether the AI era's hunger for huge parcels and gigawatt-scale power keeps the buildout in industrial zones or pushes it toward the collar counties and downstate land where neighbors live closer.
What Illinois residents are dealing with
No organized pattern of Illinois data center complaints is documented. The national record identifies what residents near existing clusters and future sites should watch:
- Noise. Around-the-clock cooling equipment is the most common neighbor complaint nationally. In Wisconsin, three residents filed a class action over noise from Microsoft's Mount Pleasant facility, seeking to represent everyone within a 1.5 mile radius. See our noise lawsuit guide.
- Electric bills. Data centers are enormous electricity consumers, and the fight over who pays for the grid to serve them is live in neighboring states, at the Ohio Supreme Court and in Oracle's suit against Wisconsin's utility commission. Illinois households have the same exposure. See our electric bill guide.
- Land use. If hyperscale projects seek large parcels beyond the industrial suburbs, rezoning fights follow, and rezonings are where residents have won their biggest victories nationally.
- Generators. Dense clusters like Elk Grove Village carry large diesel backup fleets, with testing noise and emissions governed by permits residents can review.
Lawsuits and disputes in Illinois
Two rezoning challenges, one law firm. Illinois went from no documented litigation to two of the most consequential land use cases in the country within ten weeks. On May 18, 2026, three Elwood residents and a nonprofit sued the City of Joliet and the developers of the Joliet Technology Center, a 795 acre, 24 building, 1.8 gigawatt campus valued at $20 billion, arguing the March 2026 rezoning was unconstitutional, the notice never mentioned a data center, and residents were denied cross-examination; Judge Victoria Breslan heard motions September 8. On July 31, a residents' collective and nine neighbors sued the Village of Grayslake, T5 Data Centers, and Alter Asset Management over T5@Chicago IV, a 472 acre, roughly 1.55 gigawatt campus, alleging a 61 second hearing, code-name-only notices, an Open Meetings Act violation, and approval of a use the zoning code does not contain. Both are pending. See our reports on the Joliet lawsuit and the Grayslake lawsuit. Local pauses have followed: Champaign County adopted a 12 month moratorium in April 2026, and Chicago's mayor issued an executive order on August 11, 2026 calling for a council moratorium, per the Programs.com tracker.
Illinois residents should still know the regional docket, because it is close by and instructive. Wisconsin alone has four pending fights: the Mount Pleasant noise class action against Microsoft, a Sierra Club challenge to the environmental review of the Port Washington campus, an open meetings suit over the same project, and Oracle's suit against the state utility commission. Ohio's data center tariff is before its supreme court. The Midwest is not quiet; Illinois just has not had its case yet, and the state's siting pattern deserves part of the credit.
Your legal options in Illinois
Illinois residents facing a proposed or operating facility have the standard paths:
- Private nuisance claims for noise, vibration, dust, or light that substantially interferes with your home, seeking damages or an injunction. Attorneys typically review these at no cost and take strong cases on a contingency fee basis.
- Zoning and permit challenges to a rezoning or special approval, strongest on procedural and notice defects. Appeal windows after a decision are short, often weeks.
- Ordinance enforcement through municipal noise and code complaints, which builds the record for any later claim.
- Rate proceedings. When regulators decide how data center grid costs are allocated, consumers and consumer advocates can intervene, the arena where the cost-shifting fight is actually being decided nationally.
A statute of limitations applies to damage claims, commonly two to six years depending on the state and claim type; an Illinois attorney can confirm which deadlines govern your situation.
If you live near an Illinois data center
Start the record: a dated log of noise and other impacts, decibel readings at your property line, photos, and written complaints to your village or county each time. For proposed projects, engage before the vote, press for enforceable noise and buffering conditions, and keep copies of everything you submit.
Then get a professional read. Our free intake form lets you tell us what is happening; where a participating attorney who handles these matters in Illinois is available, we may share your information with them with your consent, but we cannot promise that anyone will contact you.
Illinois cases we are tracking
- The Joliet Technology Center Lawsuit: Residents Challenge a $20 Billion, 1.8 Gigawatt Rezoning
On May 18, 2026, three Elwood residents and a newly formed nonprofit sued the City of Joliet and the developers of the Joliet Technology Center, a 795 acre, 24 building, 1.8 gigawatt campus valued at $20 billion, arguing the March 2026 rezoning from agricultural to light industrial was unconstitutional, the public notice never mentioned a data center, and residents were denied cross-examination. The city calls voiding the vote too extreme a remedy. Judge Victoria Breslan heard motions September 8, 2026.
- The Grayslake Lawsuit: Nine Neighbors Sue to Void a 472 Acre, 1.55 Gigawatt Data Center Campus
On July 31, 2026, a residents' collective and nine Lake County homeowners sued the Village of Grayslake, T5 Data Centers, and Alter Asset Management to void approvals for T5@Chicago IV, a 472 acre, 10 million square foot campus drawing about 1.55 gigawatts. The suit alleges a 61 second hearing, code-name-only public notices, an Open Meetings Act violation, and approvals for a use the zoning code does not contain. What the case says and what it means for anyone facing a fast-tracked approval.
- Sangamon County Approved a 600 Megawatt CyrusOne Campus as a Conditional Use in a Farm Zone, on a Grain Elevator Analogy
On April 7, 2026 the Sangamon County Board granted zoning for a roughly $500 million, 280 acre, 600 megawatt CyrusOne campus near Waverly by a vote of 17 to 10 with one abstention. It was not a rezoning and not a variance. County staff analogized a hyperscale data center to a large grain elevator and routed it as a conditional permitted use inside the Agricultural district. What the county record shows, what it does not, and why the mechanism decides what a challenger would be appealing.
Frequently asked questions
Can I sue a data center in Illinois?
Illinois residents can bring private nuisance and property damage claims against a facility that substantially interferes with their home, and can challenge defective zoning approvals. No data center lawsuit is documented in Illinois yet as of August 2026, but the same tools are behind active cases next door in Wisconsin, and an attorney can evaluate your facts.
Where are the data centers in Illinois?
The market centers on Chicago and its suburbs, with Elk Grove Village near O'Hare holding one of the densest data center concentrations in America. Downtown Chicago hosts carrier and trading infrastructure, and capacity spreads through the western and northwestern suburbs, supported by strong state incentives.
Why hasn't Illinois had data center lawsuits like Wisconsin?
Siting, mostly. Illinois facilities have historically been built in industrial suburbs like Elk Grove Village, among warehouses rather than homes, while the lawsuits in Wisconsin, Virginia, and Georgia involve big campuses placed near residential areas through contested approvals. If Illinois projects start seeking large parcels near neighborhoods, the risk profile changes.
Will data centers raise electric bills in Illinois?
The risk is real and the fight is regional: Ohio regulators created a data center tariff that is now before the Ohio Supreme Court, and Oracle sued Wisconsin's utility commission over large-load rules. How Illinois regulators allocate grid costs for large loads will determine what households pay, and consumer participation in those proceedings is the main lever.
What should I do if a data center is proposed near my Illinois home?
Engage before approval: attend hearings, submit written comments, and press for enforceable conditions on noise, buffering, and generator testing. If the approval process looks defective, contact an attorney quickly, because challenges run on short deadlines and procedural flaws have voided approvals in other states.
Is a data center disrupting your home in Illinois?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us