Data Center Registry
Project Kilo Data Center (South Elgin)
South Elgin, Kane County, Illinois
Project Kilo Data Center (South Elgin) is a proposed data center in South Elgin, Illinois (Kane County), operated by White Rose Partners. The public record puts it at 20 acres. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- White Rose Partners
- Facility type
- Data center
- Location
- 33W304 Kenyon Road, South Elgin, Kane County, IL
- Coordinates
- 42.0007, -88.2795 (approximate)
- Power capacity
- Not established from a public source
- Land
- 20 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 12, 2026ProposedConcept plan pending before the South Elgin Planning and Zoning Commission; the August 2026 hearing date was left undecided after two cancellations. Source: Shaw Local / Kane County Chronicle
Opposition and litigation at this site
Yes. Organized local opposition to Project Kilo Data Center (South Elgin) in South Elgin, Kane County, Illinois is documented in the public record, without a lawsuit on file in the sources we track. An online petition against the project had 8,347 signatures as of 28 July 2026; the developer launched an informational website in response, characterising the objections as misinformation.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
An online petition against the project had 8,347 signatures as of 28 July 2026; the developer launched an informational website in response, characterising the objections as misinformation.
Power and water
Developer describes a closed-loop system requiring a one-time fill of less than half an Olympic pool, with ongoing operational water use projected below that of two average single-family homes.
Notes on the record
A 200,000 sq ft building proposed on 20 acres at the northwest corner of Kenyon Road and Illinois Route 25, in unincorporated Elgin Township adjoining South Elgin. Managing partner Jeff Eigenbrood; the land is owned by a former Kane County Board member. No power capacity has been disclosed. Coordinates are derived from the mapped extent of Kenyon Road and are approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Compass Datacenters Hoffman Estates Campus · Hoffman Estates · Compass Datacenters6 mi · Under construction
- Brennan Barrington Hills Data Center · Barrington Hills · Brennan Investment Group7 mi · Cancelled · Opposed
- Microsoft Hoffman Estates Data Center · Hoffman Estates · Microsoft9 mi · Operating
- Hut 8 Batavia Data Center · Batavia · Batavia DC Corp (Hut 8 Corp subsidiary)10 mi · Under construction · 50 MW · Mixed reception
- NTT Chicago CH2 Data Center · Itasca · NTT Global Data Centers14 mi · Operating · 36 MW
- NTT Chicago CH1 Data Center · Itasca · NTT Global Data Centers14 mi · Operating · 36 MW
- Oracle Elk Grove Village Data Center · Elk Grove Village · Oracle14 mi · Proposed
- CyrusOne CHI1-CHI3 (Aurora) · Aurora · CyrusOne14 mi · Operating · 109 MW
Questions people ask about this site
Is there opposition to the Project Kilo Data Center (South Elgin) in South Elgin?
Yes. Organized local opposition to Project Kilo Data Center (South Elgin) in South Elgin, Kane County, Illinois is documented in the public record, without a lawsuit on file in the sources we track. An online petition against the project had 8,347 signatures as of 28 July 2026; the developer launched an informational website in response, characterising the objections as misinformation.
Has anyone filed a lawsuit over the Project Kilo Data Center (South Elgin)?
No lawsuit over Project Kilo Data Center (South Elgin) appears in the record we track as of September 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Project Kilo Data Center (South Elgin) use?
No water withdrawal figure for Project Kilo Data Center (South Elgin) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Project Kilo Data Center (South Elgin), and how big is it?
White Rose Partners is the operator on record. No capacity figure is on record for this site. The site is recorded at 20 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Project Kilo Data Center (South Elgin)," updated September 12, 2026, https://suedatacenters.org/data-centers/white-rose-project-kilo-south-elgin-il.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/white-rose-project-kilo-south-elgin-il, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Data center developer launches website to allay South Elgin's fears · Shaw Local / Kane County Chronicle · retrieved September 12, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us