Edged DeKalb Campus (Project Vector) is a permitted data center in DeKalb, Illinois (DeKalb County), operated by Edged (Endeavour Energy). The public record puts it at announced November 2025, 560 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- Edged (Endeavour Energy)
- Facility type
- Data center
- Location
- DeKalb, DeKalb County, IL
- Coordinates
- 41.8783, -88.7538 (approximate)
- Power capacity
- Not established from a public source
- Land
- 560 acres
- Investment
- Not established from a public source
- Announced
- November 2025
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- December 8, 2025PermittedDeKalb City Council unanimously approved the annexation agreement, annexation, rezoning and concept plan for four data center buildings and two electrical substations on approximately 560 acres; city project list shows construction 2026-32. Source: City of DeKalb
Opposition and litigation at this site
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Edged DeKalb Campus (Project Vector) in DeKalb, DeKalb County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Four data center buildings plus two electrical substations on both sides of Illinois Route 23, north of Keslinger Road and west of Crego Road, immediately south of Meta's DeKalb data center. Land is largely owned by ChicagoWest Business Center; petitioner of record is JJK 343 LLC. Coordinates are the IL-23 / Keslinger Road intersection (OSM), the site's southern edge, not a parcel centroid. No megawatt figure has been published.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- KARIS DeKalb Campus (Peace and Gurler Roads) · DeKalb · Karis Acquisitions2 mi · Permitted
- Meta DeKalb Data Center · DeKalb · Meta3 mi · Operating · Supported
- Steward Drive Data Center (Rochelle) · Rochelle · Midwest Power Investors LLC (LFF Industrial)15 mi · Cancelled · 150 MW · Opposed
- Project Steel Data Center Campus · Yorkville · Prologis19 mi · Permitted
- Project Cardinal Data Center Campus · Yorkville · Pioneer Development LLC19 mi · Permitted · 1.8 GW · In litigation
- CyrusOne Yorkville Technology Campus (CHI-11) · Yorkville · CyrusOne20 mi · Under construction
- Hut 8 Batavia Data Center · Batavia · Batavia DC Corp (Hut 8 Corp subsidiary)25 mi · Under construction · 50 MW · Mixed reception
- Edged Chicago Campus, Aurora (ORD01) · Aurora · Edged US25 mi · Under construction · 72 MW · Mixed reception
Questions people ask about this site
Is there opposition to the Edged DeKalb Campus (Project Vector) in DeKalb?
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Edged DeKalb Campus (Project Vector) in DeKalb, DeKalb County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Edged DeKalb Campus (Project Vector)?
No lawsuit over Edged DeKalb Campus (Project Vector) appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Edged DeKalb Campus (Project Vector) use?
No water withdrawal figure for Edged DeKalb Campus (Project Vector) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Edged DeKalb Campus (Project Vector), and how big is it?
Edged (Endeavour Energy) is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 560 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Edged DeKalb Campus (Project Vector)," updated September 25, 2026, https://suedatacenters.org/data-centers/edged-dekalb-project-vector-il.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edged-dekalb-project-vector-il, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.City of DeKalb Zoning & Development Projects list as of 7/15/2026, JJK 343 LLC / Edged (Project Vector), Rt. 23 and Keslinger Rd, 560 acres, approved 12/8/25 · City of DeKalb · retrieved September 25, 2026 · original offline, no archived copy found
- 2.Unanimous yes to 560-acre DeKalb data center · Shaw Local / Daily Chronicle · retrieved September 25, 2026
- 3.City of DeKalb Zoning & Development Projects list as of 3/18/2026 · City of DeKalb · retrieved September 25, 2026 · original offline, no archived copy found
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us