Data Center Registry
Project Steel Data Center Campus
Yorkville, Kendall County, Illinois · All 9 Prologis sites
Project Steel Data Center Campus is a permitted data center in Yorkville, Illinois (Kendall County), operated by Prologis. The public record puts it at announced June 2025, 540 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- Prologis
- Facility type
- Data center
- Location
- Yorkville, Kendall County, IL
- Coordinates
- 41.6990, -88.4840 (approximate)
- Power capacity
- Not established from a public source
- Land
- 540 acres
- Investment
- Not established from a public source
- Announced
- June 2025
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 12, 2026PermittedYorkville City Council approved annexation, rezoning from R-1 to M-2, and the preliminary/final PUD on 24 March 2026, with one dissenting vote. Source: Yorkville Herald
Opposition and litigation at this site
Nothing on record as of September 12, 2026. No lawsuit, organized opposition, or contested hearing over Project Steel Data Center Campus in Yorkville, Kendall County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Petitioner Prologis, L.P. as contract purchaser across 16 parcels totalling roughly 540 acres east of Eldamain Road between Corneils Road and Galena Road. Plans as revised in March 2026 call for 16 data center buildings totalling over 9 million sq ft plus three electrical substations, built in three phases over about 20 years, with first-phase construction anticipated in summer 2027. Power capacity has not been disclosed. Coordinates are the centre of the described parcel boundaries and are approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Project Cardinal Data Center Campus · Yorkville · Pioneer Development LLC1 mi · Permitted · 1.8 GW · In litigation
- CyrusOne Yorkville Technology Campus (CHI-11) · Yorkville · CyrusOne1 mi · Under construction
- Edged Chicago Campus, Aurora (ORD01) · Aurora · Edged US12 mi · Under construction · 72 MW · Mixed reception
- CyrusOne CHI1-CHI3 (Aurora) · Aurora · CyrusOne14 mi · Operating · 109 MW
- Hut 8 Batavia Data Center · Batavia · Batavia DC Corp (Hut 8 Corp subsidiary)15 mi · Under construction · 50 MW · Mixed reception
- Equinix CH8 Minooka · Minooka · Equinix21 mi · Proposed
- Centersquare ORD4 (Lisle) · Lisle · Centersquare (Csquare)21 mi · Operating
- Meta DeKalb Data Center · DeKalb · Meta21 mi · Operating · Supported
Questions people ask about this site
Is there opposition to the Project Steel Data Center Campus in Yorkville?
Nothing on record as of September 12, 2026. No lawsuit, organized opposition, or contested hearing over Project Steel Data Center Campus in Yorkville, Kendall County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Project Steel Data Center Campus?
No lawsuit over Project Steel Data Center Campus appears in the record we track as of September 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Project Steel Data Center Campus use?
No water withdrawal figure for Project Steel Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Project Steel Data Center Campus, and how big is it?
Prologis is the operator on record. We hold 9 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 540 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Project Steel Data Center Campus," updated September 12, 2026, https://suedatacenters.org/data-centers/prologis-project-steel-yorkville-il.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/prologis-project-steel-yorkville-il, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Project Steel Data Center Campus (Annexation Agreement, Rezone, Preliminary PUD & PUD), case 2025-07 · City of Yorkville, Illinois · retrieved September 12, 2026
- 2.Yorkville City Council Approves "Project Steel" Data Center Amid Resident Opposition · Yorkville Herald · retrieved September 12, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us