CyrusOne Yorkville Technology Campus (CHI-11)
Yorkville, Kendall County, Illinois · All 24 CyrusOne sites · Every CyrusOne case on our tracker
CyrusOne Yorkville Technology Campus (CHI-11) is a data center under construction in Yorkville, Illinois (Kendall County), operated by CyrusOne. The public record puts it at announced 2024, 228 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- CyrusOne
- Facility type
- Data center
- Location
- Yorkville, Kendall County, IL
- Coordinates
- 41.6790, -88.4800 (approximate)
- Power capacity
- Not established from a public source
- Land
- 228 acres
- Investment
- Not established from a public source
- Announced
- 2024
- Utility
- ComEd
- Power source
- Grid
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 12, 2026Under constructionApproved by the City of Yorkville in 2024; water and sanitary improvements began in 2025 and site work in early 2026, with first building completion expected late 2027. Source: CyrusOne
Opposition and litigation at this site
Nothing on record as of September 12, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne Yorkville Technology Campus (CHI-11) in Yorkville, Kendall County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Dedicated transmission infrastructure designed for the facility and funded by CyrusOne.
CyrusOne describes a closed-loop air-cooled system that continuously circulates water within a sealed circuit inside the building, with minimal ongoing discharge in normal operation.
Notes on the record
Applicant C1 Yorkville, LLC, with Yorkville Nexus LLC, on roughly 228 acres east of Eldamain Road, north of the BNSF railroad and Faxon Road, west of Beecher Road. A 2026 major PUD amendment reduced the plan from nine two-story buildings (about 2,451,200 sq ft) to eight one-story buildings (about 2,163,800 sq ft maximum) and cut height from 70 ft to about 50 ft 10 in. Distinct from the tracked CyrusOne Aurora, Wood Dale and Sangamon County campuses. Coordinates are the centre of the described parcel boundaries and are approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Project Steel Data Center Campus · Yorkville · Prologis1 mi · Permitted
- Project Cardinal Data Center Campus · Yorkville · Pioneer Development LLC2 mi · Permitted · 1.8 GW · In litigation
- Edged Chicago Campus, Aurora (ORD01) · Aurora · Edged US13 mi · Under construction · 72 MW · Mixed reception
- CyrusOne CHI1-CHI3 (Aurora) · Aurora · CyrusOne15 mi · Operating · 109 MW
- Hut 8 Batavia Data Center · Batavia · Batavia DC Corp (Hut 8 Corp subsidiary)16 mi · Under construction · 50 MW · Mixed reception
- Equinix CH8 Minooka · Minooka · Equinix19 mi · Proposed
- Centersquare ORD4 (Lisle) · Lisle · Centersquare (Csquare)22 mi · Operating
- Morris Technology Park · Morris · Tract22 mi · Permitted · 1 GW · Supported
Questions people ask about this site
Is there opposition to the CyrusOne Yorkville Technology Campus (CHI-11) in Yorkville?
Nothing on record as of September 12, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne Yorkville Technology Campus (CHI-11) in Yorkville, Kendall County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the CyrusOne Yorkville Technology Campus (CHI-11)?
No lawsuit over CyrusOne Yorkville Technology Campus (CHI-11) appears in the record we track as of September 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does CyrusOne Yorkville Technology Campus (CHI-11) use?
No water withdrawal figure for CyrusOne Yorkville Technology Campus (CHI-11) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates CyrusOne Yorkville Technology Campus (CHI-11), and how big is it?
CyrusOne is the operator on record. We hold 24 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 228 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "CyrusOne Yorkville Technology Campus (CHI-11)," updated September 12, 2026, https://suedatacenters.org/data-centers/cyrusone-yorkville-chi11-il.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cyrusone-yorkville-chi11-il, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.C1 Yorkville, Cyrus One CHI-11 Data Center Campus (Major PUD Amendment & Preliminary PUD Plan), case PZC 2026-03 · City of Yorkville, Illinois · retrieved September 12, 2026
- 2.Yorkville Technology Campus · CyrusOne · retrieved September 12, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us