Facility record
Permitted
- Operator
- Karis Acquisitions
- Facility type
- Data center
- Location
- DeKalb, DeKalb County, IL
- Coordinates
- 41.8930, -88.7242 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 22, 2024PermittedDeKalb City Council approved an amendment to Ordinance 2023-038 to accommodate a 1,750,000 sq ft data center in seven buildings at the NE corner of Peace and Gurler Roads; still carried on the city's project list as of 7/15/2026. Source: City of DeKalb
Opposition and litigation at this site
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over KARIS DeKalb Campus (Peace and Gurler Roads) in DeKalb, DeKalb County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Seven-building, 1,750,000 sq ft campus. Coordinates are the Peace Road / Gurler Road intersection (OSM); the approval describes the NE corner, so the true footprint lies north-east of this point. No megawatt figure appears in the city record.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Edged DeKalb Campus (Project Vector) · DeKalb · Edged (Endeavour Energy)2 mi · Permitted
- Meta DeKalb Data Center · DeKalb · Meta4 mi · Operating · Supported
- Steward Drive Data Center (Rochelle) · Rochelle · Midwest Power Investors LLC (LFF Industrial)17 mi · Cancelled · 150 MW · Opposed
- Project Steel Data Center Campus · Yorkville · Prologis18 mi · Permitted
- Project Cardinal Data Center Campus · Yorkville · Pioneer Development LLC19 mi · Permitted · 1.8 GW · In litigation
- CyrusOne Yorkville Technology Campus (CHI-11) · Yorkville · CyrusOne19 mi · Under construction
- Hut 8 Batavia Data Center · Batavia · Batavia DC Corp (Hut 8 Corp subsidiary)23 mi · Under construction · 50 MW · Mixed reception
- Edged Chicago Campus, Aurora (ORD01) · Aurora · Edged US24 mi · Under construction · 72 MW · Mixed reception
Questions people ask about this site
Is there opposition to the KARIS DeKalb Campus (Peace and Gurler Roads) in DeKalb?
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over KARIS DeKalb Campus (Peace and Gurler Roads) in DeKalb, DeKalb County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the KARIS DeKalb Campus (Peace and Gurler Roads)?
No lawsuit over KARIS DeKalb Campus (Peace and Gurler Roads) appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does KARIS DeKalb Campus (Peace and Gurler Roads) use?
No water withdrawal figure for KARIS DeKalb Campus (Peace and Gurler Roads) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates KARIS DeKalb Campus (Peace and Gurler Roads), and how big is it?
Karis Acquisitions is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "KARIS DeKalb Campus (Peace and Gurler Roads)," updated September 25, 2026, https://suedatacenters.org/data-centers/karis-dekalb-campus-il.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/karis-dekalb-campus-il, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.City of DeKalb Zoning & Development Projects list as of 7/15/2026, Steven Goldin and Karis Acquisitions, NE Corner of Peace and Gurler Roads, 1,750,000 sq ft data center in seven buildings, approved 7/22/24 · City of DeKalb · retrieved September 25, 2026 · original offline, no archived copy found
- 2.City of DeKalb Zoning & Development Projects list as of 3/18/2026 (same entry) · City of DeKalb · retrieved September 25, 2026 · original offline, no archived copy found
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us