Data Center Registry
Equinix CH1
Chicago, Cook County, Illinois · All 23 Equinix sites
Equinix CH1 is an operating data center in Chicago, Illinois (Cook County), operated by Equinix.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Equinix
- Facility type
- Data center
- Location
- 350 East Cermak Road, Chicago, Cook County, IL, 60616
- Coordinates
- 41.8536, -87.6180 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of July 23, 2026. No lawsuit, organized opposition, or contested hearing over Equinix CH1 in Chicago, Cook County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Located at 350 East Cermak Road, downtown Chicago, per Equinix's own Chicago data centers directory; corroborated by baxtel.com and cloudandcolocation.com.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Digital Realty ORD10 · Chicago · Digital Realtyunder 1 mile · Operating
- HydraVault Chicago · Chicago · HydraVaultunder 1 mile · Under construction · 20 MW
- Netrality 717 South Wells · Chicago · Netrality Data Centers2 mi · Operating
- Digital Realty ORD11 · Chicago · Digital Realty2 mi · Operating
- Serverfarm CH1 · Chicago · Serverfarm2 mi · Operating · 21.5 MW
- CoreSite CH1 · Chicago · CoreSite2 mi · Operating
- Lambda Chicago EdgeConneX AI Factory · Chicago · Lambda2 mi · Under construction · 23 MW
- QTS Chicago 1 · Chicago · QTS Data Centers3 mi · Operating
Questions people ask about this site
Is there opposition to the Equinix CH1 data center in Chicago?
Nothing on record as of July 23, 2026. No lawsuit, organized opposition, or contested hearing over Equinix CH1 in Chicago, Cook County, Illinois appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Equinix CH1 data center?
No lawsuit over Equinix CH1 appears in the record we track as of July 23, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Equinix CH1 use?
No water withdrawal figure for Equinix CH1 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Equinix CH1, and how big is it?
Equinix is the operator on record. We hold 23 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Equinix CH1," updated July 23, 2026, https://suedatacenters.org/data-centers/equinix-ch1-il.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/equinix-ch1-il, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Equinix facility directory · Equinix · retrieved July 22, 2026
- 2.OpenStreetMap node/12695496267 · OpenStreetMap · retrieved July 22, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us