Cloverleaf Troy Data Center Campus is a proposed data center in Troy, Illinois (Madison County), operated by Cloverleaf Infrastructure. The public record puts it at 500 MW planned. It has documented support and documented opposition on record.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Cloverleaf Infrastructure
Facility type
Data center
Location
Troy, Madison County, IL
Coordinates
38.7190, -89.9130 (approximate)
Power capacity
500 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Ameren Illinois
Power source
Grid
Cooling
Closed loop
Water use
0.032 million gallons a day, reported
Jobs
1,000 construction
Public subsidy
Not established from a public source
Community reception
Mixed reception
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 12, 2026
    Proposed
    No special-use permit application had been filed as of February 2026; site moved from farmland north of the interstate to farmland off Formosa Road after church-proximity objections. Source: Belleville News-Democrat (via Yahoo News)

Opposition and litigation at this site

Partly. Both documented support and documented opposition to Cloverleaf Troy Data Center Campus in Troy, Madison County, Illinois appear in the record, with no clear majority position. About 400 residents attended a 4.5-hour City of Troy meeting in February 2026; petitions circulated against the project while union representatives spoke in support.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.

About 400 residents attended a 4.5-hour City of Troy meeting in February 2026; petitions circulated against the project while union representatives spoke in support.

Source: Belleville News-Democrat (via Yahoo News)

Power and water

Developer has requested 500 MW from Ameren, which is studying whether the grid can support the load; Cloverleaf states the data center will pay for all required generation and transmission upgrades.

Closed-loop recycled-water cooling with an initial fill of about 1 million gallons and roughly 32,000 gallons per day ongoing. Cloverleaf's municipal presentation states no groundwater wells would be used, domestic water only.

Notes on the record

Four data center buildings plus substation, office and warehouse proposed on farmland off Formosa Road near Collinsville Road. Cloverleaf is a powered-land developer; no end tenant has been named. A permanent-jobs estimate of 100-200 was given as a range and is not recorded as a single value. Coordinates are derived from the mapped road intersection and are approximate.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Cloverleaf Troy Data Center Campus in Troy?

Partly. Both documented support and documented opposition to Cloverleaf Troy Data Center Campus in Troy, Madison County, Illinois appear in the record, with no clear majority position. About 400 residents attended a 4.5-hour City of Troy meeting in February 2026; petitions circulated against the project while union representatives spoke in support.

Has anyone filed a lawsuit over the Cloverleaf Troy Data Center Campus?

No lawsuit over Cloverleaf Troy Data Center Campus appears in the record we track as of September 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Cloverleaf Troy Data Center Campus use?

0.032 million gallons a day is the reported figure on record. Cooling is recorded as closed_loop. Closed-loop recycled-water cooling with an initial fill of about 1 million gallons and roughly 32,000 gallons per day ongoing.

Who operates Cloverleaf Troy Data Center Campus, and how big is it?

Cloverleaf Infrastructure is the operator on record. We hold 7 sites for that company across the registry. Capacity on record is 500 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Cloverleaf Troy Data Center Campus," updated September 12, 2026, https://suedatacenters.org/data-centers/cloverleaf-troy-il.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cloverleaf-troy-il, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Proposed Data Center Informational Meeting, Cloverleaf Infrastructure (City of Troy presentation) · City of Troy, Illinois · retrieved September 12, 2026 · original offline, archived copy from February 11, 2026
  2. 2.Troy residents grill city, developer about data centers. What did they learn? · Belleville News-Democrat (via Yahoo News) · retrieved September 12, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us