LCUB Data Center (Lenoir City Utilities Board) is an operating data center in Lenoir City, Tennessee (Loudon County), operated by Lenoir City Utilities Board.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Lenoir City Utilities Board
- Facility type
- Data center
- Location
- 7698 Creekwood Park Blvd, Lenoir City, Loudon County, TN, 37772
- Coordinates
- 35.8408, -84.2657 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Lenoir City Utilities Board (TVA)
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- January 2018OperatingLCUB's operations facility off Creekwood Park Boulevard became fully operational in January 2018; the utility now markets enterprise colocation from the site (PeeringDB record created April 2026) Source: News-Herald (Lenoir City)
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over LCUB Data Center (Lenoir City Utilities Board) in Lenoir City, Loudon County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Served by multiple, geographically diverse LCUB substations powered by TVA; A/B power paths with battery backup and on-site industrial generators; 480 VAC service listed in PeeringDB
Notes on the record
Public-power-utility-owned colocation data center 15 minutes from Knoxville and 10 minutes from ORNL; carrier-neutral with LCUB Broadband. Capacity and floor area not published.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CleanSpark Lenoir City Bitcoin Mining Facility · Lenoir City · CleanSpark, Inc.3 mi · Operating · 40 MW
- Oak Ridge Leadership Computing Facility (Frontier supercomputer) · Oak Ridge · Oak Ridge National Laboratory (UT-Battelle for the U.S. Department of Energy)7 mi · Operating
- Oak Ridge Reservation AI Data Center Sites (DOE land lease) · Oak Ridge · U.S. Department of Energy10 mi · Proposed
- The Fort (TenHats Knoxville Data Center) · Knoxville · TenHats (formerly SH Data Technologies)21 mi · Operating
- DarkHorse Technologies (Cathedra Bitcoin) Rockwood Data Center · Rockwood · DarkHorse Technologies Inc. (formerly Sphere 3D Corp.; site from Cathedra Bitcoin)24 mi · Operating · 10 MW
- Bitdeer Knoxville AI Datacenter (5101 S. National Drive) · Knoxville · Bitdeer25 mi · Under construction · 86 MW
Questions people ask about this site
Is there opposition to the LCUB Data Center (Lenoir City Utilities Board) in Lenoir City?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over LCUB Data Center (Lenoir City Utilities Board) in Lenoir City, Loudon County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the LCUB Data Center (Lenoir City Utilities Board)?
No lawsuit over LCUB Data Center (Lenoir City Utilities Board) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does LCUB Data Center (Lenoir City Utilities Board) use?
No water withdrawal figure for LCUB Data Center (Lenoir City Utilities Board) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates LCUB Data Center (Lenoir City Utilities Board), and how big is it?
Lenoir City Utilities Board is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "LCUB Data Center (Lenoir City Utilities Board)," updated September 21, 2026, https://suedatacenters.org/data-centers/lcub-data-center-lenoir-city-tn.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/lcub-data-center-lenoir-city-tn, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.PeeringDB facility 17123: LCUB Data Center, 7698 Creekwood Park Blvd, Lenoir City (record created 2026-04-27; owner; diverse serving substations) · PeeringDB · retrieved September 21, 2026
- 2.LCUB Data Center, Lenoir City Utilities Board (colocation marketing page) · Lenoir City Utilities Board · retrieved September 21, 2026 · original offline, no archived copy found
- 3.New LCUB facility ready (Loudon County News-Herald, Jan 10, 2018), LCUB's new facility off Creekwood Park Boulevard · News-Herald (Lenoir City) · retrieved September 21, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us