LCUB Data Center (Lenoir City Utilities Board)

Lenoir City, Loudon County, Tennessee

OperatingNo reception on recordRecord updated September 21, 2026

LCUB Data Center (Lenoir City Utilities Board) is an operating data center in Lenoir City, Tennessee (Loudon County), operated by Lenoir City Utilities Board.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Lenoir City Utilities Board
Facility type
Data center
Location
7698 Creekwood Park Blvd, Lenoir City, Loudon County, TN, 37772
Coordinates
35.8408, -84.2657 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Lenoir City Utilities Board (TVA)
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. January 2018
    Operating
    LCUB's operations facility off Creekwood Park Boulevard became fully operational in January 2018; the utility now markets enterprise colocation from the site (PeeringDB record created April 2026) Source: News-Herald (Lenoir City)

Opposition and litigation at this site

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over LCUB Data Center (Lenoir City Utilities Board) in Lenoir City, Loudon County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Served by multiple, geographically diverse LCUB substations powered by TVA; A/B power paths with battery backup and on-site industrial generators; 480 VAC service listed in PeeringDB

Notes on the record

Public-power-utility-owned colocation data center 15 minutes from Knoxville and 10 minutes from ORNL; carrier-neutral with LCUB Broadband. Capacity and floor area not published.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near LCUB Data Center (Lenoir City Utilities Board)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the LCUB Data Center (Lenoir City Utilities Board) in Lenoir City?

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over LCUB Data Center (Lenoir City Utilities Board) in Lenoir City, Loudon County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the LCUB Data Center (Lenoir City Utilities Board)?

No lawsuit over LCUB Data Center (Lenoir City Utilities Board) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does LCUB Data Center (Lenoir City Utilities Board) use?

No water withdrawal figure for LCUB Data Center (Lenoir City Utilities Board) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates LCUB Data Center (Lenoir City Utilities Board), and how big is it?

Lenoir City Utilities Board is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "LCUB Data Center (Lenoir City Utilities Board)," updated September 21, 2026, https://suedatacenters.org/data-centers/lcub-data-center-lenoir-city-tn.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/lcub-data-center-lenoir-city-tn, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.PeeringDB facility 17123: LCUB Data Center, 7698 Creekwood Park Blvd, Lenoir City (record created 2026-04-27; owner; diverse serving substations) · PeeringDB · retrieved September 21, 2026
  2. 2.LCUB Data Center, Lenoir City Utilities Board (colocation marketing page) · Lenoir City Utilities Board · retrieved September 21, 2026 · original offline, no archived copy found
  3. 3.New LCUB facility ready (Loudon County News-Herald, Jan 10, 2018), LCUB's new facility off Creekwood Park Boulevard · News-Herald (Lenoir City) · retrieved September 21, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us