Sue Data Centers

Data Center Registry

Bitdeer Knoxville AI Datacenter (5101 S. National Drive)

Knoxville, Knox County, Tennessee · All 7 Bitdeer sites

Under constructionNo reception on recordRecord updated September 9, 2026

Bitdeer Knoxville AI Datacenter (5101 S. National Drive) is a data center under construction in Knoxville, Tennessee (Knox County), operated by Bitdeer. The public record puts it at 86 MW planned, 9.88 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
Bitdeer
Facility type
Data center
Location
Knoxville, Knox County, TN
Coordinates
35.9413, -83.8361 (approximate)
Power capacity
86 MW planned
Land
9.88 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Knoxville Utilities Board
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. April 30, 2026
    Under construction
    under construction per Bitdeer Technologies Group FY2025 Form 20-F, filed 2026-04-30 Source: SEC EDGAR (Bitdeer Technologies Group, CIK 0001899123)

Opposition and litigation at this site

Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Bitdeer Knoxville AI Datacenter (5101 S. National Drive) in Knoxville, Knox County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

Existing Bitmain/Bitdeer Bitcoin mining site operational since May 2020 (property acquired 2018 via Commercial Purchase and Sale Agreement with Kemet Foil Manufacturing LLC, 9.88 acres / 77,678 sq ft industrial building). The 20-F discloses an active conversion to AI cloud use: Phase 1 (37MW) targeted Q4 2026, Phase 2 (49MW) targeted Q1 2027, against 86MW total electrical capacity in use as of 2026-03-31. Coordinates are an approximate parcel-area estimate for the South National Drive industrial corridor in Knox County (near APN 110-02627 per public tax-assessment/LoopNet listing) since no geocoder was available in-session to pin the exact parcel centroid, flagging for a follow-up precision pass if the site is approved. Crypto-mining site converting to AI (Bitdeer 20-F): Phase 1 37 MW targeted Q4 2026, Phase 2 49 MW Q1 2027; zero AI capacity live today (the existing 86 MW is legacy mining load being phased out). Status re-checked 2026-09-09: no change. Bitdeer's own filing still describes the Knoxville AI conversion as in design/build with a Q4 2026 target, so the record stays under_construction.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Bitdeer Knoxville AI Datacenter (5101 S. National Drive) data center in Knoxville?

Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Bitdeer Knoxville AI Datacenter (5101 S. National Drive) in Knoxville, Knox County, Tennessee appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Bitdeer Knoxville AI Datacenter (5101 S. National Drive) data center?

No lawsuit over Bitdeer Knoxville AI Datacenter (5101 S. National Drive) appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Bitdeer Knoxville AI Datacenter (5101 S. National Drive) use?

No water withdrawal figure for Bitdeer Knoxville AI Datacenter (5101 S. National Drive) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Bitdeer Knoxville AI Datacenter (5101 S. National Drive), and how big is it?

Bitdeer is the operator on record. We hold 7 sites for that company across the registry. Capacity on record is 86 MW. The site is recorded at 9.88 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Bitdeer Knoxville AI Datacenter (5101 S. National Drive)," updated September 9, 2026, https://suedatacenters.org/data-centers/bitdeer-knoxville-tn.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/bitdeer-knoxville-tn, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Bitdeer Technologies Group FY2025 Form 20-F, filed 2026-04-30 · SEC EDGAR (Bitdeer Technologies Group, CIK 0001899123) · retrieved July 17, 2026
  2. 2.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us