Data Center Registry
STACK DFW02 (Lancaster)
Lancaster, Dallas County, Texas · All 21 STACK Infrastructure sites
STACK DFW02 (Lancaster) is a data center under construction in Lancaster, Texas (Dallas County), operated by STACK Infrastructure. The public record puts it at 500 MW planned, 193 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- STACK Infrastructure
- Facility type
- Data center
- Location
- Lancaster, Dallas County, TX
- Coordinates
- 32.5921, -96.7561 (approximate)
- Power capacity
- 500 MW planned
- Land
- 193 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Oncor
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over STACK DFW02 (Lancaster) in Lancaster, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Operator describes committed power from Oncor via a dedicated substation.
Notes on the record
193-acre campus in south Dallas County, described by the operator as under development with up to 500 MW available; earlier reporting described a 220 MW first build of six 36 MW data centers across roughly 1.5 million sq ft off E Belt Line Road. Status is recorded as under construction on the strength of the operator's 'under development' framing and committed substation; treat as provisional. Coordinates are a city-level geocode.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Red Oak Campus · Red Oak · Compass Datacenters5 mi · Proposed · Mixed reception
- Red Oak Campus · Red Oak · DataBank6 mi · Under construction · 480 MW
- Google Red Oak Campus · Red Oak · Google6 mi · Operating · Mixed reception
- Crow Holdings Stemmons Corridor Data Center Campus · Dallas · Crow Holdings (developed and leased by CleanArc Data Centers)13 mi · Proposed · 245 MW
- Flexential Dallas - Downtown Dallas · Dallas · Flexential15 mi · Operating
- PowerHouse Grand Prairie Campus · Grand Prairie · PowerHouse Data Centers15 mi · Under construction · 1.8 GW
- TierPoint Dallas · Dallas · TierPoint16 mi · Operating
- Lumen Dallas 1 · Dallas · Lumen Technologies16 mi · Operating
Questions people ask about this site
Is there opposition to the STACK DFW02 (Lancaster) data center in Lancaster?
Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over STACK DFW02 (Lancaster) in Lancaster, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the STACK DFW02 (Lancaster) data center?
No lawsuit over STACK DFW02 (Lancaster) appears in the record we track as of August 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does STACK DFW02 (Lancaster) use?
No water withdrawal figure for STACK DFW02 (Lancaster) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates STACK DFW02 (Lancaster), and how big is it?
STACK Infrastructure is the operator on record. We hold 21 sites for that company across the registry. Capacity on record is 500 MW. The site is recorded at 193 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "STACK DFW02 (Lancaster)," updated August 26, 2026, https://suedatacenters.org/data-centers/stack-dfw02-lancaster-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/stack-dfw02-lancaster-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Dallas/Ft. Worth Hyperscale Data Center Campus, operator location page · STACK Infrastructure · retrieved August 26, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us