Crow Holdings Stemmons Corridor Data Center Campus is a proposed data center in Dallas, Texas (Dallas County), operated by Crow Holdings (developed and leased by CleanArc Data Centers). The public record puts it at announced January 20, 2026, 245 MW planned, 40 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Crow Holdings (developed and leased by CleanArc Data Centers)
Facility type
Data center
Location
Dallas, Dallas County, TX
Coordinates
32.7763, -96.7969 (approximate)
Power capacity
245 MW planned
Land
40 acres
Investment
Not established from a public source
Announced
January 20, 2026
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. January 20, 2026
    Proposed
    Crow Holdings announced the 245 MW campus; CleanArc named as development and leasing lead in February 2026. Source: Crow Holdings

Opposition and litigation at this site

Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over Crow Holdings Stemmons Corridor Data Center Campus in Dallas, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Planned dedicated on-site substation sized to support the full 245 MW campus; long-lead equipment procurement and substation planning reported in process.

Notes on the record

Roughly 40 acres along the Stemmons Corridor that Crow Holdings has owned for decades, currently vacant. First building is 70 MW with delivery targeted for late 2027. The exact parcel address is not disclosed in the announcement, so coordinates are a Dallas city-level geocode rather than a parcel point.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Crow Holdings Stemmons Corridor Data Center Campus in Dallas?

Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over Crow Holdings Stemmons Corridor Data Center Campus in Dallas, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Crow Holdings Stemmons Corridor Data Center Campus?

No lawsuit over Crow Holdings Stemmons Corridor Data Center Campus appears in the record we track as of August 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Crow Holdings Stemmons Corridor Data Center Campus use?

No water withdrawal figure for Crow Holdings Stemmons Corridor Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Crow Holdings Stemmons Corridor Data Center Campus, and how big is it?

Crow Holdings (developed and leased by CleanArc Data Centers) is the operator on record. Capacity on record is 245 MW. The site is recorded at 40 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Crow Holdings Stemmons Corridor Data Center Campus," updated August 26, 2026, https://suedatacenters.org/data-centers/crow-holdings-cleanarc-stemmons-dallas-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/crow-holdings-cleanarc-stemmons-dallas-tx, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Crow Holdings Announces 245MW Flagship Data Center Campus in Central Dallas · Crow Holdings · retrieved August 26, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us