Edged Dallas (Irving)

Irving, Dallas County, Texas · All 6 Edged Energy sites

OperatingNo reception on recordAI likelyRecord updated October 28, 2026

Edged Dallas (Irving) is an operating data center in Irving, Texas (Dallas County), operated by Edged Energy. The public record puts it at 24 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Edged Energy
Facility type
Data center, AI use likely
Location
505 North Wildwood Drive, Irving, Dallas County, TX, 75061
Coordinates
32.8212, -96.9170 (approximate)
Power capacity
24 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Edged Dallas (Irving) in Irving, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

ThermalWorks closed-loop waterless cooling; the operator states the design eliminates water use for cooling and supports up to 70 kW per rack air-cooled or 200 kW per rack with liquid cooling.

Notes on the record

Edged's April 2024 announcement says the facility at 505 N Wildwood Drive "will deliver 24 MW of critical capacity"; DataCenterNews US reported on 16 January 2026 that Edged US opened the first Edged Dallas facility in January 2025. The operator cites a portfolio-average PUE of 1.15 and a 74% reduction in energy overhead against a 1.58 global average. DataCenterNews US reported on 16 January 2026 that Irving City Council unanimously approved a second 24 MW building on the same campus, with groundbreaking expected in the second quarter of 2026; that expansion is not recorded here.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Edged Dallas (Irving)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Edged Dallas (Irving) data center in Irving?

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Edged Dallas (Irving) in Irving, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Edged Dallas (Irving) data center?

No lawsuit over Edged Dallas (Irving) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Edged Dallas (Irving) use?

No water withdrawal figure for Edged Dallas (Irving) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Edged Dallas (Irving), and how big is it?

Edged Energy is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 24 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Edged Dallas (Irving)," updated October 28, 2026, https://suedatacenters.org/data-centers/edged-dallas-irving-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edged-dallas-irving-tx, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Edged Continues North American Expansion with New, Ultra-Efficient, AI Ready Data Center in Irving, Texas · Edged Energy · retrieved August 26, 2026
  2. 2.Edged gains approval for second waterless AI data centre · DataCenterNews US · retrieved October 28, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us