Data Center Registry
QTS Irving 1
Irving, Dallas County, Texas · All 36 QTS Data Centers sites · Every QTS and Compass Datacenters case on our tracker
QTS Irving 1 is an operating data center in Irving, Texas (Dallas County), operated by QTS Data Centers. The public record puts it at 165 MW planned, 56 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- QTS Data Centers
- Facility type
- Data center
- Location
- 6431 Longhorn Drive, Irving, Dallas County, TX, 75063
- Coordinates
- 32.8972, -96.9826
- Power capacity
- 165 MW planned
- Land
- 56 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of July 26, 2026. No lawsuit, organized opposition, or contested hearing over QTS Irving 1 in Irving, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Confirmed 6-building campus on Longhorn Dr, Irving, TX, 165MW+ critical capacity, 56 acres.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Microsoft Irving Data Centers · Irving · Microsoft5 mi · Proposed
- Prime DFW01-01 · Dallas · Prime Data Centers7 mi · Operating · 8 MW
- Lumen Dallas 6 · Dallas · Lumen Technologies7 mi · Operating
- Equinix Dallas DA12 (West Dallas) · Dallas · Equinix9 mi · Proposed
- Lumen Dallas 1 · Dallas · Lumen Technologies9 mi · Operating
- TierPoint Dallas · Dallas · TierPoint10 mi · Operating
- Flexential Dallas - Downtown Dallas · Dallas · Flexential12 mi · Operating
- Crow Holdings Stemmons Corridor Data Center Campus · Dallas · Crow Holdings (developed and leased by CleanArc Data Centers)14 mi · Proposed · 245 MW
Questions people ask about this site
Is there opposition to the QTS Irving 1 data center in Irving?
Nothing on record as of July 26, 2026. No lawsuit, organized opposition, or contested hearing over QTS Irving 1 in Irving, Dallas County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the QTS Irving 1 data center?
No lawsuit over QTS Irving 1 appears in the record we track as of July 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does QTS Irving 1 use?
No water withdrawal figure for QTS Irving 1 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates QTS Irving 1, and how big is it?
QTS Data Centers is the operator on record. We hold 36 sites for that company across the registry. Capacity on record is 165 MW. The site is recorded at 56 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "QTS Irving 1," updated July 26, 2026, https://suedatacenters.org/data-centers/qts-irving-1-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/qts-irving-1-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.QTS facility directory · QTS · retrieved July 22, 2026
- 2.OpenStreetMap way/526806006 · OpenStreetMap · retrieved July 22, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us