Red Oak Campus is a data center under construction in Red Oak, Texas (Ellis County), operated by DataBank. The public record puts it at announced September 10, 2024, 480 MW planned, 292 acres, a reported $837 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- DataBank
- Facility type
- Data center
- Location
- Red Oak, Ellis County, TX
- Coordinates
- 32.5135, -96.7282 (approximate)
- Power capacity
- 480 MW planned
- Land
- 292 acres
- Investment
- $837 million
- Announced
- September 10, 2024
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2026Under construction$2B loan secured; first building operational before end of 2026. Source: Construction Owners
Opposition and litigation at this site
Nothing on record as of September 8, 2026. No lawsuit, organized opposition, or contested hearing over Red Oak Campus in Red Oak, Ellis County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
292-acre, 8-building campus. Distinct operator/site from Compass Datacenters' separate Red Oak, TX campus (same town, different companies).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Google Red Oak Campus · Red Oak · Google4 mi · Operating · Mixed reception
- Red Oak Campus · Red Oak · Compass Datacenters5 mi · Proposed · Mixed reception
- STACK DFW02 (Lancaster) · Lancaster · STACK Infrastructure6 mi · Under construction · 500 MW
- PowerHouse Grand Prairie Campus · Grand Prairie · PowerHouse Data Centers19 mi · Under construction · 1.8 GW
- Crow Holdings Stemmons Corridor Data Center Campus · Dallas · Crow Holdings (developed and leased by CleanArc Data Centers)19 mi · Proposed · 245 MW
- Aligned DFW-03 · Mansfield · Aligned Data Centers20 mi · Operating
- Flexential Dallas - Downtown Dallas · Dallas · Flexential21 mi · Operating
- TierPoint Dallas · Dallas · TierPoint22 mi · Operating
Questions people ask about this site
Is there opposition to the Red Oak Campus in Red Oak?
Nothing on record as of September 8, 2026. No lawsuit, organized opposition, or contested hearing over Red Oak Campus in Red Oak, Ellis County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Red Oak Campus?
No lawsuit over Red Oak Campus appears in the record we track as of September 8, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Red Oak Campus use?
No water withdrawal figure for Red Oak Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Red Oak Campus, and how big is it?
DataBank is the operator on record. We hold 23 sites for that company across the registry. Capacity on record is 480 MW. The site is recorded at 292 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Red Oak Campus," updated September 8, 2026, https://suedatacenters.org/data-centers/databank-red-oak-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/databank-red-oak-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.DataBank lands $2 billion loan for Dallas data center expansion · Construction Owners · retrieved July 17, 2026 · original offline, no archived copy found
- 2.Bisnow, DataBank Secures $2B Construction Loan For Red Oak Data Centers · retrieved July 25, 2026
- 3.DataBank, Red Oak Campus (operator site) · retrieved July 25, 2026
- 4.Dallas Innovates, DataBank Announces New 480MW North Texas Data Center Campus Featuring Eight Two-Story Data Centers · retrieved July 25, 2026
- 5.DataBank Secures $2.0B of Construction Financing for First Three Data Centers on New South Dallas Campus · DataBank · retrieved September 8, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation