Simple Mining Cascade (Dubuque County)

Cascade, Dubuque County, Iowa · All 3 Simple Mining sites

ProposedNo reception on recordRecord updated August 8, 2026

Simple Mining Cascade (Dubuque County) is a proposed crypto mining site in Cascade, Iowa (Dubuque County), operated by Simple Mining. The public record puts it at announced March 2026, 15 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Simple Mining
Facility type
Crypto mining
Location
Cascade, Dubuque County, IA
Coordinates
42.2997, -91.0143 (approximate)
Power capacity
Not established from a public source
Land
15 acres
Investment
Not established from a public source
Announced
March 2026
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of August 8, 2026. No lawsuit, organized opposition, or contested hearing over Simple Mining Cascade (Dubuque County) in Cascade, Dubuque County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

Proposed crypto-mining buildout in Cascade's industrial park (east of Industrial St SE / north of Industrial Ct SE), Oak Hill neighborhood. Simple Mining purchased 15 acres; ~5 acres would host the mining facility itself. Backed by Cascade Economic Development Corporation; city would receive $40,000/yr per the proposed agreement. Still required city council approval of a building permit as of the most recent reporting I could fetch, status kept at 'proposed', not 'permitted'. Targeted construction 'late spring or early summer' [2026] with an operations goal of Dec 31, 2026. Two independently-fetched local outlets DISAGREE on scale (30 containers @150 sq ft per Telegraph Herald vs. 40 containers @160 sq ft per Eagle 102.3FM) and neither gives a company-confirmed MW figure, one outlet offered its own estimate of '10 and 40 megawatts based on industry standards,' which I'm treating as a reporter's inference, not a sourced fact, so capacityMw is omitted. Used 'reported' rather than 'confirmed' confidence given the factual inconsistency between the two outlets and the still-pending approval. ~6-8 jobs expected.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Simple Mining Cascade (Dubuque County) data center in Cascade?

Nothing on record as of August 8, 2026. No lawsuit, organized opposition, or contested hearing over Simple Mining Cascade (Dubuque County) in Cascade, Dubuque County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Simple Mining Cascade (Dubuque County) data center?

No lawsuit over Simple Mining Cascade (Dubuque County) appears in the record we track as of August 8, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Simple Mining Cascade (Dubuque County) use?

No water withdrawal figure for Simple Mining Cascade (Dubuque County) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Simple Mining Cascade (Dubuque County), and how big is it?

Simple Mining is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 15 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Simple Mining Cascade (Dubuque County)," updated August 8, 2026, https://suedatacenters.org/data-centers/simple-mining-cascade-ia.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/simple-mining-cascade-ia, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Cascade mayor, economic development leader disagree on crypto mining facility's impact · Telegraph Herald · retrieved August 8, 2026
  2. 2.Cascade Residents Weigh Pros and Cons of Bitcoin Mining Project · Eagle 102.3FM · retrieved August 8, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us