Sue Data Centers

Data Center Registry

Simple Mining Manchester

Manchester, Delaware County, Iowa · All 3 Simple Mining sites

PermittedNo reception on recordRecord updated August 8, 2026

Simple Mining Manchester is a permitted crypto mining site in Manchester, Iowa (Delaware County), operated by Simple Mining. The public record puts it at announced January 2025.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Permitted

Operator
Simple Mining
Facility type
Crypto mining
Location
Manchester, Delaware County, IA
Coordinates
42.4842, -91.4515 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
January 2025
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of August 8, 2026. No lawsuit, organized opposition, or contested hearing over Simple Mining Manchester in Manchester, Delaware County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

Manchester City Council approved the site plan for what company owner Adam Haynes called the company's 'largest facility yet': 50 modular ~8x20-ft container units (each paired with cooling units), a new electrical substation, and a small office building, in Manchester's industrial park. Draws power from a separate electrical grid per the company; air-cooled, minimal water use. Six to eight full-time jobs. Construction was reported (as of Jan 2025) scheduled to start 'later this spring' [2025], that's the last independently-confirmed checkpoint I could source; by now (Aug 2026, ~19 months later) it has very likely advanced to under_construction or operational, but I could not independently reconfirm current status, so left it at the last-verified 'permitted' (site-plan-approved) stage. RECOMMEND A STATUS RECHECK before publishing. Exact street address (widely reported elsewhere as 1016 Grant Street) is NOT included here because I only ever saw it in WebSearch AI-summaries of manchesterpress.com/telegraphherald.com, never on a page I successfully fetched (manchesterpress.com 429'd twice), used Manchester city-seat coordinates instead per the approximate-precision fallback rule. No MW capacity figure found anywhere.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Simple Mining Manchester data center in Manchester?

Nothing on record as of August 8, 2026. No lawsuit, organized opposition, or contested hearing over Simple Mining Manchester in Manchester, Delaware County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Simple Mining Manchester data center?

No lawsuit over Simple Mining Manchester appears in the record we track as of August 8, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Simple Mining Manchester use?

No water withdrawal figure for Simple Mining Manchester is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Simple Mining Manchester, and how big is it?

Simple Mining is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Simple Mining Manchester," updated August 8, 2026, https://suedatacenters.org/data-centers/simple-mining-manchester-ia.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/simple-mining-manchester-ia, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Manchester official tries to calm fears over incoming crypto-mining operation · Radio Iowa · retrieved August 8, 2026
  2. 2.Mining in Manchester?: Crypto-currency biz eyes development at city industrial park · Telegraph Herald · retrieved August 8, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us