DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE)

Washington, District of Columbia County, Washington, D.C. · All 2 District of Columbia Office of the Chief Technology Officer sites

ProposedNo reception on recordRecord updated October 20, 2026

DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) is a proposed data center in Washington, Washington, D.C. (District of Columbia County), operated by District of Columbia Office of the Chief Technology Officer (OCTO).

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
District of Columbia Office of the Chief Technology Officer (OCTO)
Facility type
Data center
Location
60 Florida Avenue NE, Washington, District of Columbia County, DC, 20002
Coordinates
38.9102, -77.0067 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of October 20, 2026. No lawsuit, organized opposition, or contested hearing over DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) in Washington, District of Columbia County, Washington, D.C. appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

A December 2022 report says the District picked 60 Florida Ave. NE in Eckington in fall 2022 as the building where OCTO/DDOT data center functions moving out of the Reeves Center would be rebuilt. The relocation and decommissioning were budgeted at about $47M; that is a program-wide figure, not this site's investment, so it is not recorded. DGS's 2021 request specified about 500 kW of critical power with N+1 UPS, generators and cooling, which is a requirement and not built capacity. DC permit records show building permit B2306169 (issued 2023-09-21) for an interior renovation of a 2-story commercial building, about 37,000 sq ft, owned by 60 Florida Avenue NE LLC. They also show supplemental electrical, mechanical and plumbing permits from October 2023 through June 2024. None of those permits mentions a data center, so the record stays listed as proposed rather than under construction or operational.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) in Washington?

Nothing on record as of October 20, 2026. No lawsuit, organized opposition, or contested hearing over DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) in Washington, District of Columbia County, Washington, D.C. appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE)?

No lawsuit over DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) appears in the record we track as of October 20, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) use?

No water withdrawal figure for DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE), and how big is it?

District of Columbia Office of the Chief Technology Officer (OCTO) is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE)," updated October 20, 2026, https://suedatacenters.org/data-centers/dc-octo-ddot-data-center-60-florida-ave-ne-washington-dc.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/dc-octo-ddot-data-center-60-florida-ave-ne-washington-dc, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.D.C. Issues New RFP For Long-Delayed Reeves Center Remake (Dec 5, 2022), data center functions to be rebuilt at 60 Florida Ave. NE, Eckington · Three60 · retrieved October 20, 2026
  2. 2.DC DGS Request for Space DGS-RFS-2021-11: OCTO and DDOT Data Center, June 2021 · DC Department of General Services · retrieved October 20, 2026
  3. 3.DC Building Permits 2023 to 60 Florida Ave NE (B2306169 interior renovation of 2-story commercial building, approx. 37,000 sq ft, plus supplemental electrical/mechanical/plumbing permits) · DC Department of Buildings via DC GIS · retrieved October 20, 2026
  4. 4.OpenStreetMap Nominatim geocode for 60 Florida Avenue NE, Washington, DC 20002 · OpenStreetMap · retrieved October 20, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us