Sue Data Centers

Data Center Registry

Project Springbank (Atlas Development Bartow County Campus)

Adairsville, Bartow County, Georgia · All 4 Atlas Development sites

ProposedNo reception on recordRecord updated September 10, 2026

Project Springbank (Atlas Development Bartow County Campus) is a proposed data center in Adairsville, Georgia (Bartow County), operated by Atlas Development LLC. The public record puts it at announced February 2025, 432 MW planned, 588 acres, a reported $4.5 billion investment.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Atlas Development LLC
Facility type
Data center
Location
Barnsley Gardens Road at Horseshoe Loop, Adairsville, Bartow County, GA
Coordinates
34.3690, -84.9341 (approximate)
Power capacity
432 MW planned
Land
588 acres
Investment
$4.5 billion
Announced
February 2025
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. February 2025
    Proposed
    Preliminary plans disclosed in a Development of Regional Impact filing; rezoning from A-1 to I-1 still required. Source: Rome News-Tribune / Northwest Georgia News

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Project Springbank (Atlas Development Bartow County Campus) in Adairsville, Bartow County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

Six buildings of about 379,000 sq ft each (2.27M sq ft total), each drawing up to 78 MW for a 432 MW campus total. Anticipated completion December 2031. No named end-user operator is attached to the project. Public-reception check (2026-09-10): Checked the original Northwest Georgia News piece (2026-09-10); it covers the Development of Regional Impact filing and a site plan from Bartow County's community development director, plus a competitor CEO's skepticism about demand forecasts being overstated -- not local resident opposition or support. No public hearing, resident reaction, or elected-official statement about this specific project was found in this source.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Project Springbank (Atlas Development Bartow County Campus) in Adairsville?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Project Springbank (Atlas Development Bartow County Campus) in Adairsville, Bartow County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Project Springbank (Atlas Development Bartow County Campus)?

No lawsuit over Project Springbank (Atlas Development Bartow County Campus) appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Project Springbank (Atlas Development Bartow County Campus) use?

No water withdrawal figure for Project Springbank (Atlas Development Bartow County Campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Project Springbank (Atlas Development Bartow County Campus), and how big is it?

Atlas Development LLC is the operator on record. We hold 4 sites for that company across the registry. Capacity on record is 432 MW. The site is recorded at 588 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Project Springbank (Atlas Development Bartow County Campus)," updated September 10, 2026, https://suedatacenters.org/data-centers/atlas-project-springbank-adairsville-ga.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/atlas-project-springbank-adairsville-ga, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.New data center proposal in Bartow would require as much power as 324K homes · Rome News-Tribune / Northwest Georgia News · retrieved August 28, 2026
  2. 2.Data Center Operator Planning $4.5B Bartow County Campus · Connect CRE · retrieved August 28, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us