Coosa Data Center (Project Gracie) is a permitted data center in Rome, Georgia (Floyd County), operated by Atlas Development LLC. The public record puts it at 200 acres. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- Atlas Development LLC
- Facility type
- Data center
- Location
- Vann Road, Rome, Floyd County, GA
- Coordinates
- 34.2570, -85.1647 (approximate)
- Power capacity
- Not established from a public source
- Land
- 200 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- May 27, 2025PermittedFloyd County Commission voted 4-0 to rezone more than 200 acres off Vann Road from Suburban Residential to Heavy Industrial. Source: Rome News-Tribune / Northwest Georgia News
Opposition and litigation at this site
Yes. Organized local opposition to Coosa Data Center (Project Gracie) in Rome, Floyd County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. A raucous crowd spoke against the rezoning over noise, night lighting and water-draw concerns; commissioners doubled public-comment time.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
A raucous crowd spoke against the rezoning over noise, night lighting and water-draw concerns; commissioners doubled public-comment time. Approval carried conditions: data-center-only heavy industrial use, dark-sky lighting, 65 dB day / 55 dB night limits at the property line, a 100-foot undisturbed setback, and fines up to $1,000/day.
Notes on the record
About 2.4 to 2.5 million sq ft across seven buildings, target completion December 2032; land previously owned by the Floyd County school system. Filed with the state as Project Gracie.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Project Sassy (Atlas Development Rome Campus) · Rome · Atlas Development LLCunder 1 mile · Proposed
- Microsoft Data Center Campus, Rome, GA · Rome · Microsoftunder 1 mile · Permitted · Supported
- Kingston Technology Hub (Thor Equities) · Kingston · Thor Equities13 mi · Proposed · 150 MW
- Project Springbank (Atlas Development Bartow County Campus) · Adairsville · Atlas Development LLC15 mi · Proposed · 432 MW
- Project Bunkhouse (Taurus/Digital Realty Data Center Campus) · Stilesboro · Taurus Investment Holdings (Taurus DC SPE LLC); to be managed by Digital Realty19 mi · Permitted · 1.8 GW · Supported
- DataBank Project Indo · Cartersville · DataBank22 mi · Proposed · 200 MW
Questions people ask about this site
Is there opposition to the Coosa Data Center (Project Gracie) in Rome?
Yes. Organized local opposition to Coosa Data Center (Project Gracie) in Rome, Floyd County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. A raucous crowd spoke against the rezoning over noise, night lighting and water-draw concerns; commissioners doubled public-comment time.
Has anyone filed a lawsuit over the Coosa Data Center (Project Gracie)?
No lawsuit over Coosa Data Center (Project Gracie) appears in the record we track as of August 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Coosa Data Center (Project Gracie) use?
No water withdrawal figure for Coosa Data Center (Project Gracie) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Coosa Data Center (Project Gracie), and how big is it?
Atlas Development LLC is the operator on record. We hold 4 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 200 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Coosa Data Center (Project Gracie)," updated August 28, 2026, https://suedatacenters.org/data-centers/atlas-coosa-project-gracie-floyd-ga.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/atlas-coosa-project-gracie-floyd-ga, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.County Commission Approves Coosa Data Center Request · Rome News-Tribune / Northwest Georgia News · retrieved August 28, 2026
- 2.Developer Pitches 2.4M SF Georgia Data Center Campus · Bisnow · retrieved August 28, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us