Atlas Development Stiles Road Data Center (Euharlee Road)

Cartersville, Bartow County, Georgia · All 5 Atlas Development sites

CancelledOpposedRecord updated September 30, 2026

Atlas Development Stiles Road Data Center (Euharlee Road) is a cancelled data center in Cartersville, Georgia (Bartow County), operated by Atlas Development LLC. The public record puts it at 302 acres. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
Atlas Development LLC
Facility type
Data center
Location
208 and 329 Stiles Road SW, Cartersville, Bartow County, GA
Coordinates
34.1354, -84.8900 (approximate)
Power capacity
Not established from a public source
Land
302 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. December 2, 2025
    Cancelled
    The applicant withdrew the conditional use permit application on 2025-12-02, before the scheduled 2025-12-15 hearing. Atlas Development gave no reason. Source: Daily Tribune News
  2. November 2025
    Proposed
    Atlas Development applied for a conditional use permit for a data center on about 302 acres at 208 and 329 Stiles Road, off Euharlee Road; a Bartow County Planning Commission hearing was set for 2025-12-15 (reported 2025-11-14 from the county's legal advertisement). Source: Daily Tribune News

Opposition and litigation at this site

Yes. Organized local opposition to Atlas Development Stiles Road Data Center (Euharlee Road) in Cartersville, Bartow County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. A change.org petition, "Say NO to the Data Center on Euharlee Rd.", started by Dani Hall on 2025-11-17, reached 2,225 signatures.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

A change.org petition, "Say NO to the Data Center on Euharlee Rd.", started by Dani Hall on 2025-11-17, reached 2,225 signatures. It cited noise, heat, power demand, water use for cooling, diesel generator emissions and habitat loss. At the 2025-11-18 Euharlee City Council meeting, resident Ron Hartman questioned plans for the site; the council took no position. The application was withdrawn on 2025-12-02, before its hearing, and the petition was marked a victory.

Source: change.org

Notes on the record

Conditional use permit application by Atlas Development for about 302 acres across two adjacent parcels at 208 and 329 Stiles Road, a loop road off Euharlee Road. The parcels are owned by Super Land Holdings LLC. According to the county's legal advertisement, if approved the zoning would have gone from A-1 (agricultural) to I-1 (general industrial), with a final decision by Commissioner Steve Taylor on 2026-01-07. The site plan showed seven structures of about 260,000 sq ft each. The Etowah River lies to the west; county Community Development Director Brandon Johnson said the site is directly across the river from Georgia Power's Plant Bowen and that a power easement runs through the property. No capacity or investment figure was disclosed, and no Georgia DRI filing was found for the project. Distinct from Atlas Development's Project Springbank (Barnsley Gardens Road, withdrawn May 2025) and from Project Bunkhouse (Taff Road, a Digital Realty project). Coordinates are the Census geocoder matches for the two stated street addresses (about 160 m apart), not a surveyed site centroid.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Atlas Development Stiles Road Data Center (Euharlee Road)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Atlas Development Stiles Road Data Center (Euharlee Road) in Cartersville?

Yes. Organized local opposition to Atlas Development Stiles Road Data Center (Euharlee Road) in Cartersville, Bartow County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. A change.org petition, "Say NO to the Data Center on Euharlee Rd.", started by Dani Hall on 2025-11-17, reached 2,225 signatures.

Has anyone filed a lawsuit over the Atlas Development Stiles Road Data Center (Euharlee Road)?

No lawsuit over Atlas Development Stiles Road Data Center (Euharlee Road) appears in the record we track as of September 30, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Atlas Development Stiles Road Data Center (Euharlee Road) use?

No water withdrawal figure for Atlas Development Stiles Road Data Center (Euharlee Road) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Atlas Development Stiles Road Data Center (Euharlee Road), and how big is it?

Atlas Development LLC is the operator on record. We hold 5 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 302 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Atlas Development Stiles Road Data Center (Euharlee Road)," updated September 30, 2026, https://suedatacenters.org/data-centers/atlas-stiles-road-cartersville-ga.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/atlas-stiles-road-cartersville-ga, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.December hearing set for possible data center · Daily Tribune News · retrieved September 30, 2026
  2. 2.Data center application withdrawn · Daily Tribune News · retrieved September 30, 2026
  3. 3.Say NO to the Data Center on Euharlee Rd. (petition, 2,225 signatures) · change.org · retrieved September 30, 2026
  4. 4.Euharlee resident questions council about data centers · Daily Tribune News · retrieved September 30, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us